NEXTDC S5 Data Centre and Innovation Hub
90 MW data centre and innovation hub at Lane Cove Road, Macquarie Park
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its EIS - NEXTDC S5 Data Centre and Innovation Hub on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
90 MW data centre and innovation hub at Lane Cove Road, Macquarie Park
The proponent proposes a data centre and innovation hub at 269 Lane Cove Road, Macquarie Park, in the City of Ryde. It would be built in two stages, with a total power consumption of 90 megawatts. The data centre would have ancillary office and innovation floor space, ground floor retail, an urban plaza and new roads. Existing structures would be demolished first. No capital investment, floor area or building height is stated.
The environmental impact statement (EIS) is dated 9 Jul 2024. It drew 9 submissions: 5 objecting, 1 supporting and 3 commenting. The proponent has since amended the project and responded to submissions. The case is now at the stage where the department has asked for more information. Next, the department assesses the project and then decides it.
- Total power consumption
- 90 MWEIS - NEXTDC S5 Data Centre and Innovation Hub
- Public submissions
- 9 submissionsPortal page
- Submissions objecting
- 5 submissionsPortal page
The department's description
Demolition of existing structures, site preparation works and construction and operation of a new Data Centre and Innovation Hub with urban plaza and the delivery of new roads.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
9 submissions: 6 from the public, 1 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
138 documents in 9 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
EIS38
- Appendix A SEARs Compliance Table
- Appendix AA Geotechnical Investigation
- Appendix B Statutory Compliance Table
- Appendix BB Waste Management Plan
- Appendix C Mitigation Measures Table
- Appendix CC Arboricultural Impact Assessment
- Appendix D Community Engagement Summary Table
- Appendix DD Access Review Report
- Appendix E Architectural Plans
- Appendix EE Green Travel Plan
- Appendix F Architectural Design Report
- Appendix FF Construction Traffic Management Plan
- Appendix G EDC Calculation Letter
- Appendix GG - Embodied Emissions Materials Form
- Appendix H Survey Plan
- Appendix HH Engagement Outcomes Report
- Appendix I BCA Compliance Report
- Appendix II Biodiversity Development Assessment Report
- Appendix J Landscape Plans
- Appendix JJ Shapefiles_Site_GCS_GDA_1994
- Appendix K Landscape Design Report
- Appendix KK Greenhouse Gas Emissions Report
- Appendix L Visual Impact Assessment
- Appendix M Transport Impact Assessment
- Appendix N ESD Report
- Appendix O Air Quality Report
- Appendix P Noise and Vibration Impact Assessment
- Appendix Q Flood Assessment Report
- Appendix R Civil Engineering Report
- Appendix S Hazards and Risk Report
- Appendix T Infrastructure Requirements Report
- Appendix U Civil Plans
- Appendix V Preliminary Site Investigation
- Appendix W ACHAR - Redacted
- Appendix X Heritage Impact Statement
- Appendix Y Social Impact Assessment
- Appendix Z Backup Power Report
- EIS - NEXTDC S5 Data Centre and Innovation Hub
Response to Submissions3
Agency Advice29
- Advice on Amended DA (Ausgrid)
- Advice on Amended DA (CPHR)
- Advice on Amended DA (EPA)
- Advice on Amended DA (FRNSW)
- Advice on Amended DA (HNSW ACH)
- Advice on Amended DA (Sydney Metro)
- Advice on Amended DA (TfNSW)
- Advice on EIS (Council) (FINAL)
- Advice on EIS (FRNSW)
- Advice on EIS (Heritage NSW - ACHA)
- Advice on EIS (Heritage NSW)
- Advice on EIS (Sydney Metro)
- Advice on EIS (TfNSW)
- Advice on EIS (Water NSW)
- Advice on RTS (EPA)
- Advice on RTS (TfNSW)
- Attachment 1 _Submission RRtS - 269 Land Cove Road
- Attachment 2 - Recomended Conditions - 269 Land Cove Road
- BCS-EIS- SSD 63168959
- CPHR Advice - SSD 63168959
- CoR Submission - Attachment 1 (Amended DA)
- CoR Submission Cover Letter (Amended DA)
- CoR Submission Cover Letter - 269 Lane Cove Road__0812 SR
- Council EIS Submission - Att. 1
- Council EIS Submission - Att. 2
- Council EIS Submission - Att. 3
- EPA Response to EIS
- Sydney Water Attach. 1 Info Steet
- Sydney Water EIS Response
Amendments45
- Amendment Acceptance Letter (SSD-63168959)
- Appendix A - Response to Submissions
- Appendix AA - Revised Geotechnical Investigation
- Appendix B - Revised Statutory Compliance Table
- Appendix BB - Revised Waste Management Plan
- Appendix C - Revised Mitigation Measures Table
- Appendix CC - Revised Arboricultural Impact Assessment
- Appendix D - Engagement Summary Table
- Appendix DD - Revised Access Review Report
- Appendix E - Revised Architectural Drawings
- Appendix EE - Revised Green Travel Plan
- Appendix F - Revised Architectural Design Report
- Appendix FF - Revised Construction Traffic Management Plan
- Appendix G - Revised EDC Letter
- Appendix GG - Revised Embodied Emissions Materials Form
- Appendix H - Site Survey
- Appendix HH - Revised Engagement Outcomes Report
- Appendix I - Revised BCA Compliance Report
- Appendix II - Revised BDAR
- Appendix J -Revised Landscape Plans
- Appendix K - Revised Landscape Design Report
- Appendix KK - Revised Greenhouse Gas Assessment
- Appendix L - Revised Visual Impact Assessment
- Appendix LL - Qualitative Wind Assessment Report
- Appendix M - Revised Traffic Impact Assessment
- Appendix MM - Greenhouse Gas Mitigation Plan
- Appendix N - Revised ESD Report
- Appendix NN - Climate Change Adaptation Plan
- Appendix O - Revised Air Quality Report
- Appendix OO - Remediation Action Plan
- Appendix P - Revised Noise and Vibration Impact Assessment
- Appendix PP - Sydney Metro Analysis
- Appendix Q - Revised Flood Risk Assessment Report
- Appendix QQ - Additional Contamination Investigation
- Appendix R - Revised Civil Engineering Report
- Appendix RR - Structural Plans
- Appendix S - Revised Hazards and Risk Report
- Appendix T - Revised Infrastructure Requirements Report
- Appendix U - Revised Civil Plans
- Appendix V - PSI
- Appendix W - Revised ACHAR
- Appendix X - Revised Heritage Impact Statement
- Appendix Y -Revised Social Impact Assessment
- Appendix Z - Revised Backup Power System Report
- NEXTDC RTS_Amendment Report
Additional Information15
- 7003_LandCoveRd_BDAR_Shapefiles_20260312
- Air Quality Technical Note
- Air Quality Technical Note
- Concept Bridge Design
- Request for Additional Information 110226
- Request for Additional Information 20032025
- Response to Supplementary Submissions_NEXTDC S5
- Tree Protection Plan & Specification
- Updated Arboricultural Impact Assessment
- Updated Architectural Plans
- Updated BDAR
- Updated Greenhouse Gas Assessment
- Updated Infrastructure Requirements Report
- Updated Landscape Design Report
- Updated Landscape Plans
What's near it
Where it is
- Suburb
- Macquarie Park
- Council area
- Ryde
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.