On the map
State significant development

New University Campus

A 21 storey university campus at 105-153 Miller Street, North Sydney

Decided: approved on 19 Mar 2026EducationDistrict scale

Where it is in the process

Approved on 19 Mar 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination19 Mar 2026 (done)
  9. Approved19 Mar 2026

What it proposes

AI summary. Written from this project's page and its SSD-83956216 Assessment Report and SSD-83956216 Development Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 21 storey university campus at 105-153 Miller Street, North Sydney

The project reuses the former MLC Building at 105-153 Miller Street, North Sydney, for a university campus with ground floor retail. It keeps the Miller Street Wing, demolishes the Denison Street Wing and adds a new 21 storey wing, with a gross floor area of 48,276 m² and 72 car spaces. The estimated development cost is $354,219,542. The department reports 307 construction jobs and 870 operational jobs.

The environmental impact statement (EIS) was exhibited from 8 Jul 2025 to 6 Aug 2025 and drew 5 submissions: 3 objecting and 2 commenting. The proponent responded on 7 Nov 2025 and gave further information on 5 Feb 2026. A director of the department, acting for the Minister, approved the project on 19 Mar 2026, with conditions. Next, the proponent must meet those conditions, including revised designs for heritage and a final flood emergency response plan, before building and occupation.

Estimated development cost
$354.2MSSD-83956216 Assessment Report
Building storeys
21 storeysSSD-83956216 Assessment Report
Gross floor area
48,276 m²SSD-83956216 Assessment Report
Car spaces
72 car spacesSSD-83956216 Assessment Report
Construction jobs
307 jobsSSD-83956216 Assessment Report
Operational jobs
870 jobsSSD-83956216 Assessment Report
Site area
6,640 m²SSD-83956216 Assessment Report

The department's description

Adaptive reuse of the existing commercial building including alterations and additions for the purpose of accommodating a tertiary institution (university).

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

5 submissions: 2 from the public, 1 from organisations and 2 from public authorities

Object3
Support0
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

103 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs2
EIS55
Response to Submissions19
Agency Advice10
Additional Information11
Determination4

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.