New Primary School at Murrumbateman
A new primary school for 368 students at Murrumbateman
Where it is in the process
Approved on 26 Oct 2021
What it proposes
AI summary. Written from this project's page and its Assessment Report and Notice of Determination on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A new primary school for 368 students at Murrumbateman
The project is a new primary school, Kindergarten to Year Six, at 2 Fairley Street, Murrumbateman, in the Yass Valley Council area. It would take up to 368 students on a site of about 1.54 ha, in three two-storey buildings and a single-storey hall, with 40 on-site car spaces and a new bus bay. The capital investment is $31,110,808, with 250 construction jobs and 28 operational jobs.
The environmental impact statement (EIS) was exhibited from 17 Jun 2021 to 14 Jul 2021. The department's report counts 10 submissions, while the portal lists 8: 1 in support and 7 comments. The proponent responded on 26 Aug 2021. A director of the department, as the Minister's delegate, approved the school on 26 Oct 2021, with conditions. Next, the proponent must meet those conditions. The consent lapses on 26 Oct 2026 unless work has physically started.
- Capital investment
- $31.1MAssessment Report
- Students
- 368 studentsAssessment Report
- Construction jobs
- 250 jobsAssessment Report
- Operational jobs
- 28 jobsAssessment Report
- Site area
- 1.54 haAssessment Report
- On-site car spaces
- 40 car spacesAssessment Report
The department's description
Construction of a new primary school
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
8 submissions: 2 from the public and 6 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
74 documents in 12 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
SEARs1
EIS27
- Appendix 1 - Architectural Drawings
- Appendix 10 - Bushfire Assessment
- Appendix 11 - Acoustic Assessment
- Appendix 12 - Infrastructure Management Plan
- Appendix 13 - Civil Engineering Report
- Appendix 14 - Contamination Report
- Appendix 15 - Structural Report
- Appendix 16 - Geotechnical Report
- Appendix 17 - Operational Waste Management Plan
- Appendix 18 - Construction Waste Management Plan
- Appendix 19 - Accessibility Report
- Appendix 2 - Design Analysis Report
- Appendix 20 - ESD Report
- Appendix 21 - Social Impact Assessment
- Appendix 22 - Consultation Report
- Appendix 23 - Section 10.7 Planning Certificate
- Appendix 24 - SEPP 64 Compliance Table
- Appendix 3 - Landscape Plan
- Appendix 4 - Site Survey Plan
- Appendix 5a - Transport Assessment
- Appendix 5b - Preliminary School Travel Plan
- Appendix 6 - Statement of Heritage Impact
- Appendix 7 - Aboriginal Heritage Report
- Appendix 8a - BDAR Waiver
- Appendix 8b - Biodiversity Constraints Letter
- Appendix 9 - Arboricultural Impact Assessment
- Environmental Impact Statement
Response to Submissions15
- App 1 - Updated architectural drawings
- App 10 - Updated civil package
- App 11 - Updated operational waste management plan
- App 12 - Consolidated response to SDRP comments
- App 13 - Public domain plan
- App 2 - Updated landscape report
- App 3 - Updated RFS submission
- App 4 - Updated acoustic assessment
- App 5 - Letter from Aboriginal heritage consultant
- App 6 - Updated ACHAR
- App 7 - Letter from traffic engineer
- App 8 - Architect's response to SDRP comments
- App 9 - Road safety audit report
- Request RTS_23072021_025505
- Response to Submissions Report
Additional Information2
Determination5
Management Plans and Strategies6
Reports2
Independent Reviews and Audits6
Other Documents7
- E6/E7 Post Occupancy Noise Survey (Operational Noise Monitoring), Rev 0 - 21032023
- E7 Operational Noise Monitoring - DPE Acknowledgement Letter 11042023
- E7 Operational Noise Monitoring - SINSW Cover Letter 11042023
- Final Demolition plan - Murrumbateman - Rev 3
- MPS B23 signage linemarking-cover letter
- Other_21122021_055435
- Weatherproofing of Roofing and External Walls
What's near it
Where it is
- Suburb
- Murrumbateman
- Council area
- Yass Valley
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.