Nerriga Battery Energy Storage System

A 600 MW battery at 6294 Nerriga Road, Nerriga

Under way: at prepare eisEnergy: batteriesRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Nerriga BESS Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 600 MW battery at 6294 Nerriga Road, Nerriga

The proponent proposes a stand-alone battery energy storage system at 6294 Nerriga Road, Nerriga, about 2 km west of the village in the Queanbeyan-Palerang Regional Council area. It would use containerised lithium-ion batteries with a capacity of up to 600 MW and 2,400 MWh, equal to four hours of storage. The batteries would store electricity from the grid when supply is high and demand is low, and send it back when demand is high. No capital investment, job numbers or site area are stated.

The proponent's scoping report is dated 23 Mar 2026, and the Secretary's environmental assessment requirements (SEARs) have been issued. The proponent is now preparing an environmental impact statement (EIS). No submissions have been made yet. Once the EIS is lodged, it is to be exhibited and the public can make submissions. The department then assesses the project.

Battery power capacity
600 MWNerriga BESS Scoping Report
Battery storage capacity
2,400 MWhNerriga BESS Scoping Report

The department's description

The construction, operation and decommissioning of 600MW/2400MWh battery and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.