On the map
State significant infrastructure

Mole River Dam

Withdrawn: withdrawnWater and sewerage

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

Mole River Dam is approximately 20 km south-west of Tenterfield in northern NSW, in the Border Rivers Catchment.

Its proposed to capture 100 GL of water storage to improve water security and reliability and flood mitigation for water users.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

5 documents in 3 folders, each on the NSW Planning Portal

Application3

See the 3 documents on the Planning Portal

SEARs1

See the document on the Planning Portal

Additional Information1

See the document on the Planning Portal

What's near it

Where it is

Suburb
Mole River
Council area
Tenterfield

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.