On the map
State significant development

Mixed use development South St, Marsden Pk

829 homes in mixed use buildings, South Street, Marsden Park

Under way: at searsHomesDistrict scale

Where it is in the process

At sears

  1. SEARs (current stage)
  2. Prepare EIS (to come)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report Site 2 on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

829 homes in mixed use buildings, South Street, Marsden Park

The proponent proposes a concept plan for six mixed use buildings and two residential flat buildings, ranging from 6 to 16 storeys, at 264A South Street, Marsden Park, in the Blacktown council area. It would hold about 829 dwellings, with shops, food and drink premises and community floor space. A first stage of three buildings, 9 to 14 storeys, would hold about 278 dwellings. The site is about 38,049 m². No capital investment is stated.

The case is at the stage of preparing the Secretary's environmental assessment requirements (SEARs). The proponent lodged a scoping report on 12 Jan 2026 asking for them. Next, the department issues the SEARs, and the proponent prepares an environmental impact statement (EIS), to be exhibited for public submissions. A rezoning is to be sought at the same time. There are no submissions yet.

Dwellings, concept proposal
829 dwellingsScoping Report Site 2
Dwellings, Stage 1
278 dwellingsScoping Report Site 2
Tallest building
16 storeysScoping Report Site 2
Stage 1 tallest building
14 storeysScoping Report Site 2
Site area
38,049 m²Scoping Report Site 2

The department's description

Concept - Six mixed use buildings and two residential flat buildings (829 units), and;

Stage 1 - Three mixed use buildings containing ground floor retail spaces and 278 units

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

5 documents in 2 folders, each on the NSW Planning Portal

Early Consultation3
Request for SEARs2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.