Mixed-use development, Rangers Road/Yeo Street
A 12 storey mixed-use building at Rangers Road, Neutral Bay
Where it is in the process
Approved on 4 May 2026
What it proposes
AI summary. Written from this project's page and its SSD Assessment Report and SSD Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 12 storey mixed-use building at Rangers Road, Neutral Bay
The project is a part 8 and part 12 storey mixed-use building at 1-7 Rangers Road and 50 Yeo Street, Neutral Bay, in the North Sydney council area. It has a supermarket, a medical centre, retail and commercial premises, and shop top housing for 97 residential units, 10 of them affordable. The maximum height is 42.37 m. It includes a 1,100 m² public plaza on a site of 4,207 m². The capital investment is $191,270,000, with 263 construction jobs and 143 operational jobs.
The environmental impact statement was exhibited from 12 Aug 2025 to 8 Sep 2025. The portal counts 49 submissions: 31 objecting, 9 supporting and 9 commenting. The proponent lodged a submissions report on 24 Oct 2025. The department recommended approval, and its Executive Director, as the Minister's delegate, approved the project on 4 May 2026, with conditions. Next, the proponent must meet those conditions before and during construction.
- Capital investment
- $191.3MSSD Assessment Report
- Residential units
- 97 dwellingsSSD Assessment Report
- Affordable living units
- 10 dwellingsSSD Assessment Report
- Construction jobs
- 263 jobsSSD Assessment Report
- Operational jobs
- 143 jobsSSD Assessment Report
- Maximum building height
- 42.37 mSSD Assessment Report
- Public plaza
- 1,100 m²SSD Assessment Report
- Site area
- 4,207 m²SSD Assessment Report
The department's description
A part 8 and part 12 storey mixed-use development consisting of a supermarket, medical centre, commercial premises, shop top housing for 97 residential units, affordable housing and associated site works
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
49 submissions: 45 from the public, 3 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
77 documents in 8 folders, each on the NSW Planning Portal
Early Consultation1
Notice of Exhibition1
Request for SEARs2
SEARs3
EIS42
- Appendix A - SEARs Compliance Table
- Appendix AA - Detailed Site Investigation
- Appendix B - Architectural Plans Part 1
- Appendix B - Architectural Plans Part 2
- Appendix B - Architectural Plans Part 3
- Appendix BB - Remediation Action Plan
- Appendix C - Statutory Compliance Table
- Appendix CC - Survey Plan
- Appendix D - Community Engagement Table
- Appendix DD - AHIMS Search
- Appendix E - Consolidated Mitigation Measures
- Appendix F - Amended Statutory Maps
- Appendix G - Design Report
- Appendix H - North Sydney DCP 2013 Response Table
- Appendix I - Landscape Plans
- Appendix J - Landscape Design Report
- Appendix K - Pedestrian Wind Assessment
- Appendix L - BDAR Waiver
- Appendix M - Services Report
- Appendix N - Traffic and Transport Impact Assessment
- Appendix O - ESD Report
- Appendix P - BASIX Certificate
- Appendix P - BASIX Stamped Drawings Part 1
- Appendix P - BASIX Stamped Drawings Part 2
- Appendix P - BASIX Stamped Drawings Part 3
- Appendix P - Embodied Emissions Materials Form
- Appendix P - NatHERS Certficate
- Appendix P - Section J
- Appendix Q - Integrated Water Management Plan
- Appendix R - Preliminary Site Investigation
- Appendix S - Engagement Outcomes Report
- Appendix T - Operational Waste Management Plan
- Appendix U - Arboricultural Assessment
- Appendix V - Fire Safety Report
- Appendix W - BCA Report
- Appendix X - Noise and Vibration Impact Assessment
- Appendix Y - Affordable Housing Management Agreement Letter
- Appendix Z - Geotechnical Report
- Application_20250724232716
- Environmental Impact and Rezoning Statement
- Estimated Development Cost Letter
- Mixed-use development, Rangers RoadYeo Street - Shapefile
Response to Submissions16
- Appendix A - Submissions Register
- Appendix B - Detailed Response to Submissions
- Appendix C - Revised Consolidated Mitigation Measures
- Appendix D - Revised Architectural Plans Part 1
- Appendix D - Revised Architectural Plans Part 2
- Appendix E - Urban Design Report
- Appendix F - Traffic Statement
- Appendix G - Data Gap Investigation Report
- Appendix H - Natural Ventilation Report
- Appendix I - Car Parking Memo
- Appendix J - Preliminary LDMP
- Appendix K - Annotated Easement Plan
- Appendix L - Updated Exhibited Urban Design Report
- Appendix M - Acoustic Statement
- Letter - RTS and RFI
- Submissions Report
Agency Advice6
What's near it
Where it is
- Suburb
- Neutral Bay
- Council area
- North Sydney
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.