On the map
State significant development

Mixed Use Development with In-Fill Affordable Housing - Moseley Street and Donald Street, Carlingford

118 apartments and a childcare centre at Moseley Street, Carlingford

Decided: approved on 1 May 2026HomesNeighbourhood scale

Where it is in the process

Approved on 1 May 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination1 May 2026 (done)
  9. Approved1 May 2026

What it proposes

AI summary. Written from this project's page and its Assessment Report and Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

118 apartments and a childcare centre at Moseley Street, Carlingford

The project is a mixed-use development at 15A-15B Moseley Street and 25-31 Donald Street, Carlingford, in the City of Parramatta. It has two buildings of 7 to 9 storeys with 118 apartments, of which 23 are affordable housing, plus a childcare centre and three basement levels. The department gives an estimated development cost of $101,819,136, with 159 construction jobs and 15 operational jobs. The site is 5,948 m².

The environmental impact statement (EIS) was exhibited from 9 Oct 2025 to 22 Oct 2025. The department received 9 submissions: 5 objecting, 2 supporting and 2 commenting. The proponent amended the proposal on 23 Feb 2026 and 22 Apr 2026, removing two levels from one building and reducing the apartments. A director of the department, acting for the Minister, approved it on 1 May 2026, with conditions. Next, the proponent must meet those conditions before and during construction.

Estimated development cost
$101.8MAssessment Report
Apartments
118 dwellingsAssessment Report
Affordable housing apartments
23 dwellingsAssessment Report
Construction jobs
159 jobsAssessment Report
Operational jobs
15 jobsAssessment Report
Site area
5,948 m²Assessment Report
Car parking spaces in basement
167 car spacesInstrument of Consent

The department's description

Demolition, excavation and construction of two six-storey residential flat buildings (comprising 136 apartments (106 market and 30 affordable housing apartments)) and a 76-place child care centre.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

9 submissions: 7 from the public, 1 from organisations and 1 from public authorities

Object5
Support2
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

1 change to the project after its decision, each assessed as a case of its own, newest first.

Mosley St Carlingford MOD 1 - Building A height increase and facade changesSSD-83870463-Mod-1

Under way: at collate submissions · 10 submissions

Design changes to Building A, including increased heights to Towers A1 and A2, window additions/removals and sill height changes, operable louvres to Level 8 Tower A1 balconies, and driveway gradient changes

Its 9 documents

9 documents in 3 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application7

See the 7 documents on the Planning Portal

Agency Advice1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

107 documents in 10 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs2
EIS41
Response to Submissions25
Agency Advice5
Amendments18
Additional Information4
Determination4
Other Documents6

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.