On the map
State significant development

Mixed Use Development - 4-8 Bells Boulevarde Kingscliff

A five-storey, 69-unit mixed use building, Bells Boulevard, Kingscliff

Under way: at assessmentHomesNeighbourhood scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A five-storey, 69-unit mixed use building, Bells Boulevard, Kingscliff

The proponent proposes a five-storey mixed use building at 4-8 Bells Boulevard, Kingscliff, in the Tweed Shire, on a vacant site of about 4,450 m². It would have 69 residential units, 2 of them affordable housing, with ground floor retail and two basement levels with 184 car spaces. It would remove 24 trees. The proposal also asks for a rezoning of the land and a higher height limit under the Tweed Local Environmental Plan 2014. The environmental impact statement (EIS) estimates about 250 construction jobs and about 30 operational jobs. No capital investment is stated.

The EIS is dated 17 Dec 2025. The case drew 173 submissions: 133 objecting, 28 supporting and 12 commenting. The proponent has responded to submissions and given further information to the department. The department is now assessing it, with advice from other agencies. Next come the department's assessment report and a determination.

New residential units
69 dwellingsEnvironmental Impact Statement
Affordable housing units
2 dwellingsEnvironmental Impact Statement
Basement car spaces
184 car spacesEnvironmental Impact Statement
Site area
4,450 m²Environmental Impact Statement
Construction jobs
250 jobsEnvironmental Impact Statement
Operational jobs
30 jobsEnvironmental Impact Statement
Trees to be removed
24 treesEnvironmental Impact Statement
Public submissions
173 submissionsPortal page

The department's description

Construction of a five-storey mixed use building including:

• Ground floor retail

• Ground floor residential

• Levels 1-4 residential

• Two affordable housing units

• Basement parking

• Landscaping, communal open space & swimming pool

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

173 submissions: 167 from the public, 5 from organisations and 1 from public authorities

Object133
Support28
Comment12

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

102 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Early Consultation1
Request for SEARs2
SEARs2
EIS41
Response to Submissions2
Agency Advice8
Additional Information45

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.