Mixed Use Development - 4-8 Bells Boulevarde Kingscliff
A five-storey, 69-unit mixed use building, Bells Boulevard, Kingscliff
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A five-storey, 69-unit mixed use building, Bells Boulevard, Kingscliff
The proponent proposes a five-storey mixed use building at 4-8 Bells Boulevard, Kingscliff, in the Tweed Shire, on a vacant site of about 4,450 m². It would have 69 residential units, 2 of them affordable housing, with ground floor retail and two basement levels with 184 car spaces. It would remove 24 trees. The proposal also asks for a rezoning of the land and a higher height limit under the Tweed Local Environmental Plan 2014. The environmental impact statement (EIS) estimates about 250 construction jobs and about 30 operational jobs. No capital investment is stated.
The EIS is dated 17 Dec 2025. The case drew 173 submissions: 133 objecting, 28 supporting and 12 commenting. The proponent has responded to submissions and given further information to the department. The department is now assessing it, with advice from other agencies. Next come the department's assessment report and a determination.
- New residential units
- 69 dwellingsEnvironmental Impact Statement
- Affordable housing units
- 2 dwellingsEnvironmental Impact Statement
- Basement car spaces
- 184 car spacesEnvironmental Impact Statement
- Site area
- 4,450 m²Environmental Impact Statement
- Construction jobs
- 250 jobsEnvironmental Impact Statement
- Operational jobs
- 30 jobsEnvironmental Impact Statement
- Trees to be removed
- 24 treesEnvironmental Impact Statement
- Public submissions
- 173 submissionsPortal page
The department's description
Construction of a five-storey mixed use building including:
• Ground floor retail
• Ground floor residential
• Levels 1-4 residential
• Two affordable housing units
• Basement parking
• Landscaping, communal open space & swimming pool
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
173 submissions: 167 from the public, 5 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
102 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Early Consultation1
Request for SEARs2
EIS41
- Appendix A - SEARs Compliance Table
- Appendix AA - Noise and Vibration Impact Assessment
- Appendix B - Site Map with Coordinates
- Appendix BB - Geotechnical and Groundwater Assessment
- Appendix C - Statutory Compliance Table
- Appendix CC - Acid Sulfate Soils Assessment
- Appendix D - Community Engagement Table
- Appendix DD - Preliminary Site Investigation
- Appendix E - Mitigation Measures Table
- Appendix EE - Social Impact Scoping Study Report
- Appendix FF - AHIMS Search
- Appendix G - Affordable Housing Floor Plans
- Appendix G - Architectural Perspectives 01
- Appendix G - Architectural Perspectives 02
- Appendix G - Architectural Perspectives 03
- Appendix G - Architectural Plans
- Appendix H - Urban Design and Architecture Report
- Appendix I - Design Verification Statement ADG Table
- Appendix J - Arboricultural Impact Assessment Report
- Appendix K - Landscape Plans
- Appendix L - Landscape Report
- Appendix M - Transport Impact Assessment
- Appendix N - Integrated Water Management Plan
- Appendix O - Operational Waste Management Plan
- Appendix P - Ecologically Sustainable Development Report
- Appendix Q - BASIX Certificate
- Appendix Q - BASIX Compliance Report
- Appendix Q - NatHERS Group Certificate
- Appendix R - Connecting with Country Report
- Appendix S - Embodied Emissions Form
- Appendix S - Estimated Development Cost Report
- Appendix T - Local Planning Directions Table
- Appendix U - BDAR waiver approval letter
- Appendix U - CPHR DCCEEW determination
- Appendix V - Economic Letter with Market commentary
- Appendix W - Servicing Strategy Report
- Appendix X - Community Engagement Report
- Appendix Y - Community Housing Provider Support Letter
- Appendix Z - CPTED Report
- EIS Appendix S - Embodied Emissions Form
- Environmental Impact Statement
Response to Submissions2
Agency Advice8
- Bells Boulevard Submission to Department
- Essential Energy
- Mixed Use Development Bells Boulevarde Kingscliff
- NTH25_00204_001 - TfNSW Response - SSD-83069459
- SEARs comments 4-8 Bells Boulevard
- SSD-83069459 - Regional Water Supplier
- Second submission to the Department - Bells Boulv
- Tweed Shire Council Submission
Additional Information45
- Appendix 1 - Agency submissions
- Appendix 1 - Amended Ground Floor Plan
- Appendix 10 - Updated Operational Waste Management Plan
- Appendix 11 - Waste letter of Response to Council
- Appendix 12 - Council response to waste collection
- Appendix 13 - BDAR Waiver applicationPart-2
- Appendix 13 - BDAR Waiver applicationPart-3
- Appendix 14 - Updated Stormwater Management Plan
- Appendix 15 - Detailed Site Investigation
- Appendix 16 - Remedial Action Plan
- Appendix 17 - Arboricultural Impact Assessment ReportPart-1
- Appendix 17 - Arboricultural Impact Assessment ReportPart-2
- Appendix 18 - Updated Geotech Report rt
- Appendix 19 - Updated Acid Sulfate Soils Report
- Appendix 2 - Amended GFA Plan
- Appendix 2 - Architectural Response DPHI RFI
- Appendix 20 - Updated BASIX Certificate
- Appendix 21 - Updated BASIX Compliance Report
- Appendix 22 - Updated NatHERS certificate
- Appendix 23 - Updated Mitigation Measures Table
- Appendix 3 - Architectural Plans Part-1
- Appendix 3 - Architectural Plans Part-2
- Appendix 3 - Architectural Plans Part-3
- Appendix 3 - Architectural Plans Part-4
- Appendix 3 - Architectural Plans Part-5
- Appendix 3 - Architectural Plans Part-6
- Appendix 3 - Updated Architectural Plans
- Appendix 3 - Waste collection
- Appendix 4 - Indicative Outdoor Seating Plan
- Appendix 4 - Updated Apartment Design Guide Report
- Appendix 5 - Operational Waste Management Plan
- Appendix 5 - Updated Urban Design ReportPart-1
- Appendix 5 - Updated Urban Design ReportPart-2
- Appendix 5 - Updated Urban Design ReportPart-3
- Appendix 5 - Updated Urban Design ReportPart-4
- Appendix 6 - Indicative Outdoor Dining Plan
- Appendix 7 - Updated Landscape Report
- Appendix 8 - Updated Landscape PlansPart-1
- Appendix 8 - Updated Landscape PlansPart-2
- Appendix 9 - Traffic Response to RFI
- RFI letter - SSD-83069459
- RFI letter II - SSD-83069459
- Response to Submissions Report
- Response to additional RFI
- VPA_Letter of Offer_Kingscliff
What's near it
Where it is
- Suburb
- Kingscliff
- Council area
- Tweed
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.