On the map
State significant development

Mixed Use Development 297 & 307 Bringelly Road

966 homes in mixed-use towers at Bringelly Road, Leppington

Under way: at prepare eisHomesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Industry Specific SEARs - Housing544324 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

966 homes in mixed-use towers at Bringelly Road, Leppington

The proponent proposes a mixed-use development, built in stages, at 297-307 Bringelly Road, Leppington, in the Camden Council area. It would have 966 dwellings, 5% of them affordable in perpetuity, in towers of 4 to 23 storeys. The plans include 3 to 4 levels of basement parking and commercial premises on the ground floor. No capital investment is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The department issued industry-specific Secretary's environmental assessment requirements (SEARs) on 10 Jul 2026. They set out what the EIS must cover, including built form, overshadowing, visual impact, transport, noise, flooding and biodiversity. No submissions have been made. Next, the EIS is lodged and exhibited, and the public can make submissions. The department then assesses the project.

Dwellings
966 dwellingsPortal page
Affordable share of dwellings
5%Portal page
Maximum building height
23 storeysPortal page
Basement parking levels (most)
4 levelsPortal page

The department's description

Construction of mixed use development, in stages, comprising mixed use towers ranging from 4 – 23 storeys, 3 – 4 levels of basement parking, ground floor commercial premises. 966 Dwellings with 5% affordable in perpetuity.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.