On the map
State significant development

Mixed Use Development 16-24 Belmore Road Randwick

A 16 storey tower with 104 apartments, 16-24 Belmore Road, Randwick

Under way: at response to submissionsHomesNeighbourhood scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Environmental Impact and Rezoning Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 16 storey tower with 104 apartments, 16-24 Belmore Road, Randwick

The proponent proposes to partly demolish the existing buildings at 16-24 Belmore Road, Randwick, in the Randwick City Council area, keeping the heritage ground and first floors of 16-20 Belmore Road. It would build a 16 storey mixed-use building with ground and first floor shops and commercial space, 104 apartments above and 4 levels of basement parking. It also seeks to change the Randwick Local Environmental Plan (LEP) 2012, raising the height limit from 12 m to 60 m and the floor space ratio from 2:1 to 6.25:1. No capital investment is stated.

The environmental impact statement (EIS) is dated 21 Aug 2026. The department has received 36 submissions: 25 objecting and 11 supporting. The proponent is now responding to them, and may amend the project. Next, the department assesses the project with advice from other agencies, then prepares an assessment report and decides it.

Apartments
104 dwellingsEnvironmental Impact and Rezoning Statement
Building height
16 storeysEnvironmental Impact and Rezoning Statement
Basement parking levels
4 levelsEnvironmental Impact and Rezoning Statement
Proposed height limit
60 mEnvironmental Impact and Rezoning Statement
Current height limit
12 mEnvironmental Impact and Rezoning Statement

The department's description

Demolition of the existing buildings and construction of a 16 storey, mixed-use, shop top housing development (podium and tower) consisting of a minimum of 104 residential apartments

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

36 submissions: 34 from the public and 2 from public authorities

Object25
Support11
Comment0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

48 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs5
EIS36
Response to Submissions1
Agency Advice4

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.