Mixed Use Development 1 King Street Concord West
Eight buildings up to 38 storeys at 1 King Street, Concord West
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its 0_Environmental Impact Statement on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Eight buildings up to 38 storeys at 1 King Street, Concord West
The proponent proposes a mixed use development at 1 King Street, Concord West, in the City of Canada Bay. It would have 8 buildings from 6 to 38 storeys, with homes, shops and commercial space, basement parking for 1,468 cars, open space and related works. The application also includes a concurrent rezoning. No capital investment or number of homes is stated.
The case is at the assessment stage. The environmental impact statement (EIS) was prepared in November 2025 and exhibited, and 271 submissions were made: 163 objecting, 94 supporting and 14 commenting. The proponent has responded to the submissions, with updated plans and studies. Next, the department assesses the project with advice from other agencies, then writes an assessment report and recommendation before a decision is made.
- Buildings
- 8 buildingsPortal page
- Maximum building height
- 38 storeysPortal page
- Basement car spaces
- 1,468 car spacesPortal page
- Public submissions
- 271 submissionsPortal page
- Submissions objecting
- 163 submissionsPortal page
The department's description
Concurrent rezoning for construction of a mixed use development comprising 8 buildings ranging in height from 6 to 38 storeys with a mix of residential, retail and commercial uses, basement parking for 1468 cars and open space and associated works.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
271 submissions: 264 from the public, 6 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
102 documents in 7 folders, each on the NSW Planning Portal
Early Consultation3
Notice of Exhibition1
Request for SEARs1
EIS50
- 0_Environmental Impact Statement
- 1 King St Concord West - EE Materials Form (NSW SEPP)
- Appendix A _SEARs Compliance Table_
- Appendix AA_Infrastructure Delievery, Management Report_
- Appendix BB_Rail Infrastructure Report_
- Appendix B_Architectural Drawings_
- Appendix CC_Geotechnical Rail Report_
- Appendix C_Statutory Compliance Table_
- Appendix DD_Structural Rail Report_
- Appendix D_Community Engagement Table_
- Appendix EE_Noise and Vibration Impact Assessment_
- Appendix E_Consolidated Mitigation Measures_
- Appendix FF_CPTED Report_
- Appendix F_EDC Report
- Appendix GG_Consultation Outcomes Report_
- Appendix G_Survey Plan_
- Appendix HH_Aboriginal Due Diligence Assessment_
- Appendix H_Civil Plans_
- Appendix II_Endorsed Design Excellence Strategy_
- Appendix I_Geotechnical Report_
- Appendix JJ_Wind Impact Assessment_
- Appendix J_Integrated WMP and Flood Assessment
- Appendix K Urban Design Report Volume 1 - Master Plan_
- Appendix KK_Tree Protection Plan_
- Appendix LL_Construction Waste Management Plan_
- Appendix L_Urban Design Report Volume 2
- Appendix MM_Operational Waste Management Plan_
- Appendix M_Urban Design Report Appendix_
- Appendix NN_Electrolysis Risk Assessment_
- Appendix N_Landscape Design Report_
- Appendix OO_Reflectivity Assessment_
- Appendix O_Connecting with Country Report_
- Appendix PP_Acid Sulphate Soil and Salinity Assessment_
- Appendix P_ESD Report_
- Appendix QQ_Detailed Site Investigation_
- Appendix Q_BDAR Request and Waiver_
- Appendix RR_Data Gap Investigation_
- Appendix R_View and Visual Impact Assessment_
- Appendix SS_Remediation Action Plan_
- Appendix S_Heritage Impact Assessment_
- Appendix TT_LEP Maps_
- Appendix T_Livable Housing Report_
- Appendix U_Ground Water Impact Assessment_
- Appendix V_Transport Impact Assessment_
- Appendix W_Design Review Report_
- Appendix X_Community Infrastructure Needs Assessment_
- Appendix Y_Social Impact Assessment_
- Appendix Z_Economic Impact Assessment_
- Application_20251112034736
- GIS Data
Response to Submissions36
- Appendix AA_Updated Social Impact Assessment
- Appendix A_Submissions Register
- Appendix BB_Updated CPTED Report
- Appendix B_Updated Consolidated Mitigation Measures
- Appendix CC_Design Excellence Process Summary Report
- Appendix C_Updated Architectural Package
- Appendix D_Solar Access Assessment - Southern Neighbours
- Appendix E_Solar Access Assessment - Rothwell Apartments
- Appendix F_Updated EDC Report
- Appendix G_Updated Civil Plans
- Appendix H_Geotechnical Report
- Appendix I_RTS Statement - Traffic and Parking
- Appendix J_Updated Integrated WMP and FIRA
- Appendix K_Dewatering Management Plan
- Appendix L_Arboricultural Impact Assessment
- Appendix M_Root Mapping Assessment
- Appendix N_Updated Liveable Housing Report
- Appendix O_Landscape Response
- Appendix P_Updated Landscape Report
- Appendix Q_Updated Wind Impact Assessment
- Appendix R_Updated Visual Impact Assessment
- Appendix S_Updated Construction Waste Management Plan
- Appendix T_Updated Operational Waste Management Plan
- Appendix U1_Updated ESD Report
- Appendix U2_EE Materials Form
- Appendix U3_Part J4 Statement of Compliance
- Appendix U4_NatHERS Cert
- Appendix U5_BASIX Certificates
- Appendix V_Updated Groundwater Impact Assessment
- Appendix W_Groundwater Modelling Report
- Appendix X_Updated CINA
- Appendix Y_Updated Economic Impact Assessment
- Appendix Z_Heritage Impact Statement
- Clause 4.6 Report Unit Mix
- RTS 4-3-26
- RTS Main Works 1 King Street Concord West
Agency Advice9
- 20250415 -TfNSW Response - SSD8199457
- CPHR Comments - SSD-81999457 - 1 King Street Concord West
- City of Canada Bay 1 King Street Concord West
- City of Canada Bay response SEARs 1 King St Concord West
- Mixed Development, King Street Concord West (SSD-81999457)
- SOPA Letter to DPHI - SSD-81999457_
- TfNSW Response SYD25-00402-02
- TfNSW-Sydney Trains Submission Letter SSD-81999457 (EIS)
- TfNSW-Sydney Trains Submission Letter SSD-81999457 SEARs
What's near it
Where it is
- Suburb
- North Strathfield
- Council area
- Canada Bay
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.