Metropolitan Continuation Project

12-year extension of the Metropolitan Coal Mine, Helensburgh

Under way: at prepare eisMiningDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its 1. Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

12-year extension of the Metropolitan Coal Mine, Helensburgh

The proponent proposes to extend the underground Metropolitan Coal Mine, next to Helensburgh, for 12 more years, to about 31 Dec 2044. Mining would continue west of the current workings, with new longwalls in the 300 and 400 series. It would take an additional 31 million tonnes of run-of-mine coal, at up to 2.7 million tonnes a year. It also proposes a Ventilation Air Methane abatement plant to destroy at least 75% of methane emissions at Ventilation Shaft 3. No capital investment or job numbers are stated.

The proponent lodged a scoping report to request the Secretary's environmental assessment requirements (SEARs), which were issued with advice from several agencies. The case is at the stage where the proponent prepares its environmental impact statement (EIS). No submissions have been made yet. Next, the EIS would be exhibited for public submissions, and the department would then assess the project.

Additional mine life
12 years1. Scoping Report
Additional run-of-mine coal
31 million tonnes1. Scoping Report
Maximum annual coal extraction
2.7 million tonnes a year1. Scoping Report
Methane destroyed at Ventilation Shaft 3
75 per cent1. Scoping Report

The department's description

12 year extension of Metropolitan Coal Mine, extending the 300 series longwalls to the west of exiting operations and adding 400 series longwalls

constructing a Ventilation Air Methane (VAM) abatement plant

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.