On the map
State significant infrastructure

Merimbula Sewage Treatment Plant Upgrade and Ocean Outfall

Merimbula sewage plant upgrade and ocean outfall pipeline

Under way: at assessmentWater and sewerageNeighbourhood scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Preliminary Environmental Assessment on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Merimbula sewage plant upgrade and ocean outfall pipeline

The project would upgrade the Merimbula Sewage Treatment Plant on Arthur Kaine Drive, Merimbula, in the Bega Valley Shire. It would also build a pipeline to carry treated wastewater to a discharge point about 2.7 km from the Merimbula Bay shoreline. Treated effluent now goes to a beach face outfall and two exfiltration ponds in the dunes, which the ponds would be decommissioned to replace. No capital investment is stated.

The case is at the assessment stage. A preliminary environmental assessment was prepared in April 2016, and revised Secretary's environmental assessment requirements (SEARs) were issued. An environmental impact statement (EIS) was exhibited, and the proponent has since lodged a response to submissions and a preferred infrastructure report. The case has 41 submissions: 31 objecting, 2 supporting and 8 commenting. Next, the department assesses the project and prepares a report before a decision.

Distance of discharge point from shoreline
2.7 kmPortal page
Public submissions
41 submissionsPortal page
Submissions objecting
31 submissionsPortal page

The department's description

To upgrade the Merimbula Sewage Treatment Plant and construct a new pipeline to convey treated wastewater to a discharge point approximately 2.7km from the Merimbula Bay shoreline.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

41 submissions: 32 from the public, 4 from organisations and 5 from public authorities

Object31
Support2
Comment8

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

70 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition2
Application1
SEARs3
EIS22
Response to Submissions7
Agency Advice29
Amendments5
Additional Information1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.