On the map
Part 4 development

Marubeni Smithfield Energy

Decided: decidedEnergy: other

Where it is in the process

At determination

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination (current stage)

What it proposes

The portal gives no description.

Modifications

3 changes to the project after its decision, each assessed as a case of its own, newest first.

Mod 1 - Marubeni Smithfield EnergyDA94/165-Mod-1

Decided: approved by the department (director)

Its page on the Planning Portal

MOD 3 - Removal of infrastructure and replacement cooling systemDA94/165-Mod-3

Decided: approved on 9 Apr 2024 by the department (director)

Removal of disused combined cycle gas turbine infrastructure including the steam turbine generator and four cell cooling towers. Installation and operation of new replacement of cooling system.

Its 16 documents

16 documents in 5 folders, each on the NSW Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Agency Advice6

See the 6 documents on the Planning Portal

Additional Information5

See the 5 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Marubeni Smithfield Energy MOD 2 - Open cycle useDA94/165-Mod-2

Decided: approved on 24 Aug 2017 by the department (director)

/

Its 9 documents

Its page on the Planning Portal

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.