Macksville Battery Energy Storage System

A 100 MW battery at Kylie Street, Macksville

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 100 MW battery at Kylie Street, Macksville

The proponent proposes a battery energy storage system with a capacity of up to 100 MW over four hours (400 MWh) on Kylie Street, Macksville, in the Nambucca Shire council area. It would sit on about 3 ha of the Macksville Industrial Estate and connect to the existing Macksville substation by a new transmission line of about 190 m. The estimated development cost is more than $125 million, with up to 50 construction jobs and up to 5 operational jobs.

The proponent lodged a scoping report in November 2024, and the Secretary's environmental assessment requirements (SEARs) were issued. The proponent is now preparing an environmental impact statement (EIS). No submissions have been made yet. Next, the EIS is exhibited and the public can make submissions. The proponent then responds, and the department assesses the project and decides it or refers it to the Independent Planning Commission.

Battery power capacity
100 MWScoping report
Battery storage capacity
400 MWhScoping report
Estimated development cost (more than)
$125MScoping report
Construction jobs
50 jobsScoping report
Operational jobs
5 jobsScoping report
Battery infrastructure area
3 haScoping report
Off-site transmission line length
190 mScoping report

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 100MW/400MWh and ancillary infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.