Lucas Heights Bioenergy Facility

A replacement landfill gas power plant at Lucas Heights

Decided: approved on 1 Apr 2026Energy: otherLocal scale

Where it is in the process

Approved on 1 Apr 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination1 Apr 2026 (done)
  9. Approved1 Apr 2026

What it proposes

AI summary. Written from this project's page and its SSD -79933225 Instrument of Consent (updated) and SSD-79933225 Department's Assessment Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A replacement landfill gas power plant at Lucas Heights

The proposal replaces the ageing landfill gas power station within the Lucas Heights Resource Recovery Park on Little Forest Road, Lucas Heights, in the Sutherland Shire. It would install 20 modular generators of 1.1 MW each on a site of about 1.8 ha, and could generate up to 190,000 MWh of electricity a year. The estimated cost is $49,804,000, with 15 construction jobs and six operational jobs. Construction would take about 6 to 8 months.

The environmental impact statement (EIS) was exhibited from 11 Nov 2025 to 8 Dec 2025. It drew one public submission, which supported it, and no submissions are recorded as objecting. The department's assessment found air quality was the key issue and recommended approval with conditions. A director of the department, acting for the Minister, approved it on 1 Apr 2026. Next, the proponent must meet the conditions, including management plans before construction and operation.

Estimated development cost
$49.8MSSD-79933225 Department's Assessment Report
Generators
20 generatorsSSD-79933225 Department's Assessment Report
Annual electricity generation
190,000 MWh a yearSSD-79933225 Department's Assessment Report
Site area
1.8 haSSD-79933225 Department's Assessment Report
Construction jobs
15 jobsSSD-79933225 Department's Assessment Report

The department's description

Construction and operation of a replacement bioenergy facility to capture landfill gas for conversion into electricity.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

44 documents in 10 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs4
EIS14
Response to Submissions3
Agency Advice9
Additional Information2
Determination4
Management Plans and Strategies4
Notifications2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.