Loftus, Gipps and Burton Streets Concord
560 homes in three towers at Loftus, Gipps and Burton Streets
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its EIS - Concurrent RZ and SSDA - Loftus Street Concord on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
560 homes in three towers at Loftus, Gipps and Burton Streets
The proponent proposes a mixed use development on 15 lots at 1-7 Burton Street, 3B-11 Loftus Street and 10-12 Gipps Street, Concord, in the City of Canada Bay. The site is 9121.8 m². It would have 560 dwellings, 318 for build to rent and 242 for build to sell, with ground floor commercial uses. A rezoning of the Canada Bay Local Environmental Plan 2013 is sought at the same time: a floor space ratio of 5:1 and a height of 78 m, or 101 m with the affordable housing bonus. No capital investment is stated.
The Secretary's environmental assessment requirements were issued on 26 Jun 2025. The environmental impact statement is dated 5 Feb 2026. The case is now at the response to submissions stage, after 9 submissions: 1 objecting, 6 supporting and 2 commenting. Next, the department assesses the project with advice from other agencies, then it is decided. No decision has been made.
- New dwellings
- 560 dwellingsEIS - Concurrent RZ and SSDA - Loftus Street Concord
- Build to rent dwellings
- 318 dwellingsEIS - Concurrent RZ and SSDA - Loftus Street Concord
- Build to sell dwellings
- 242 dwellingsEIS - Concurrent RZ and SSDA - Loftus Street Concord
- Site area
- 9,121.8 m²EIS - Concurrent RZ and SSDA - Loftus Street Concord
- Proposed building height
- 78 mEIS - Concurrent RZ and SSDA - Loftus Street Concord
- Height with affordable housing bonus
- 101 mEIS - Concurrent RZ and SSDA - Loftus Street Concord
The department's description
Mixed use development comprising 3 residential towers and ground floor commercial uses
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
9 submissions: 8 from the public and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
64 documents in 7 folders, each on the NSW Planning Portal
Early Consultation2
Notice of Exhibition1
Request for SEARs2
SEARs4
EIS46
- Appendix 10 - Civil and Stormwater Plans
- Appendix 11 - Flood Impact and Risk Assessment
- Appendix 12 - Transport Impact Assessment
- Appendix 13 - Pedestrian Wind Assessment
- Appendix 14 - Noise and Vibration Impact Assessment
- Appendix 15 - Acid Sulfate Soils Review
- Appendix 16 - Preliminary Site Investigation
- Appendix 17 - Geotechnical Investigation
- Appendix 18 - Hazardous Materials Survey
- Appendix 19 - BCA Assessment
- Appendix 1A - Key Legislation
- Appendix 1C - Compliance Table City of Canada Bay LEP
- Appendix 1D - ADG compliance Table
- Appendix 1E - ADG Compliance Plans
- Appendix 1F- Stakeholder and Community Engagement Table
- Appendix 1G - Mitigation Measures table
- Appendix 2 - SEARS Compliance Table
- Appendix 20 - Accessibility Report
- Appendix 21- Statement of Heritage Impact
- Appendix 22 - Aboriginal Cultural Heritage Assessment
- Appendix 23 - Connecting with Country Report
- Appendix 24 - BDAR Waiver
- Appendix 25 - Demolition Construction and Operational WMP
- Appendix 26 - Stormwater Management Report
- Appendix 27 - Stakeholder Engagement Outcomes Report
- Appendix 28 - ESD Report
- Appendix 28 - ESD Report
- Appendix 29 - CPTED Report
- Appendix 3 - Affordable Housing Nomination Letter
- Appendix 30 - Loftus Street Concord VIA
- Appendix 31 - Arboricultural Impact Assessment
- Appendix 32 - Draft Plan of Subdivision
- Appendix 33A - Independent Design Review Panel Mtg1
- Appendix 33B - Independent Design Review Panel Mtg2
- Appendix 34 - Public Space Plan
- Appendix 35 - Services Infrastructure REport
- Appendix 36 - Concord Oval Turf Report
- Appendix 5 - Architectural Plans
- Appendix 6 - Design Verification Statement
- Appendix 7 - Urban Design Report
- Appendix 8 - Survey Plan
- Appendix 9A - Landscape Plan
- Appendix 9B - Landscape Report
- Application_20260311053455
- Architecturals
- EIS - Concurrent RZ and SSDA - Loftus Street Concord
Response to Submissions1
Agency Advice8
- 26-0524 Notice of Property Development Below the OLS
- Council's submission
- DCCEEW Water - Loftus, Gipps and Burton St Concord
- Letter Out - Housing Delivery Authority (SSD-84962709)
- Loftus Gipps and Burton Streets Concord (SSD-84962709)
- Sydney Metro Response
- Sydney Water SSD84962709
- TfNSW Response SYD25-00619-03
What's near it
Where it is
- Suburb
- Concord
- Council area
- Canada Bay
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.