Lake Victoria Wind Farm
A wind farm of up to 147 turbines near Wentworth
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A wind farm of up to 147 turbines near Wentworth
The proponent proposes a wind farm of up to 147 turbines, spread over about 42,173 ha, about 24 km north-west of Wentworth in the Wentworth Shire. The turbines would reach 280 m at the blade tip and the project would have a maximum generation capacity of 1 GW. It would also have up to three batteries with a combined 1,200 MWh of storage. The environmental impact statement (EIS) estimates 750 direct construction jobs and 70 direct operational jobs. No capital investment is stated.
The EIS is dated August 2026. The project is at the response to submissions stage, after exhibition drew 120 submissions: 109 objecting, 5 supporting and 6 commenting. The proponent now responds to the submissions and may amend the project. The department then assesses it, with advice from other agencies, and a decision follows.
- Wind turbines
- 147 turbinesEnvironmental Impact Statement
- Maximum generation capacity
- 1 GWEnvironmental Impact Statement
- Battery storage capacity
- 1,200 MWhEnvironmental Impact Statement
- Project area
- 42,173 haEnvironmental Impact Statement
- Maximum blade-tip height
- 280 mEnvironmental Impact Statement
- Direct construction jobs
- 750 jobsEnvironmental Impact Statement
- Direct operational jobs
- 70 jobsEnvironmental Impact Statement
- Native vegetation impacted
- 1,220.28 haEnvironmental Impact Statement
The department's description
Development of a wind farm with up to 147 wind turbines, battery storage and associated infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
120 submissions: 104 from the public, 15 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
54 documents in 6 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
SEARs19
EIS20
- Environmental Impact Statement
- Tech Report 01 - LCVIA
- Tech Report 02 - Biodiversity Development Assessment Report
- Tech Report 03 - Noise and Vibration Impact Assessment
- Tech Report 04 - Socio-Economic Impact Assessment
- Tech Report 05 - Traffic and Transport Impact Assessment
- Tech Report 06 - ACHA Vol 1
- Tech Report 06 - ACHA Vol 2
- Tech Report 07 - Non-Aboriginal Heritage Assessment
- Tech Report 08 - Soils and Contamination Assessment
- Tech Report 09 - Surface Water and Groundwater
- Tech Report 10 - Flooding and Hydrology Assessment
- Tech Report 11 - Aviation Impact Assessment
- Tech Report 12 - Electromagnetic Interference Assessment
- Tech Report 13 - Electric and Magnetic Fields Assessment
- Tech Report 14 - Bushfire Assessment Report
- Tech Report 15 - Preliminary Hazards Analysis
- Tech Report 16 - Blade Throw Assessment
- Tech Report 17 - Air Quality Assessment
- Tech Report 18 - Land Use Conflict Risk Assessment
Response to Submissions1
Agency Advice12
- Advice on EIS - CASA
- Advice on EIS - CPHR MCEF
- Advice on EIS - Crown Lands
- Advice on EIS - DPIRD Agriculture & Biosecurity
- Advice on EIS - DPIRD Fisheries
- Advice on EIS - Development Coordination Authority
- Advice on EIS - EPA
- Advice on EIS - Fire & Rescue NSW
- Advice on EIS - NSW Health
- Advice on EIS - NSW Resources
- Advice on EIS - SES
- Advice on EIS - Water NSW
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.