On the map
State significant infrastructure

Lake Lyell Pumped Hydro Energy Storage

A 440 MW pumped hydro project at Lake Lyell, South Bowenfels

Under way: at response to submissionsEnergy: batteriesDistrict scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 440 MW pumped hydro project at Lake Lyell, South Bowenfels

The proponent proposes a pumped hydro energy storage project at Lake Lyell, about 5 kilometres west of Lithgow, in the Lithgow City Council area. It would store up to 3,080 MWh and generate at 385 MW for 8 hours, or up to around 440 MW for a shorter period. A new upper reservoir would be built on Mount Walker, linked by underground tunnels and a powerhouse to the existing lake, with a 150 m connection to an existing transmission line. A workforce accommodation camp is also proposed. No capital investment or job numbers are stated.

The project was declared critical State significant infrastructure in June 2024. The environmental impact statement (EIS) is dated 25 Feb 2026. It drew 207 submissions: 169 objecting, 27 supporting and 11 commenting. The proponent is now responding to the submissions. Next, the department assesses the project, and the Minister decides.

Power capacity (shorter period)
440 MWPortal page
Energy storage capacity
3,080 MWhEIS
Generation at 8 hours' duration
385 MWEIS
Transmission connection length
150 mEIS
Distance west of Lithgow
5 kmEIS
Public submissions
207 submissionsPortal page

The department's description

Development of a pumped hydro energy storage and generation project up to 440 MW; grid connection and ancillary infrastructure. This project has been declared Critical State Significant Infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

207 submissions: 196 from the public, 10 from organisations and 1 from public authorities

Object169
Support27
Comment11

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

69 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1
Application2
SEARs18
EIS30
Response to Submissions1
Agency Advice17

What's near it

Its point is approximate (the register's own, to about a kilometre), and so are these.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.