Kogarah Golf Club Redevelopment - Concept & Stage 1 Works
Concept plan for a logistics precinct at Marsh Street, Arncliffe
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its EIS - Final on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Concept plan for a logistics precinct at Marsh Street, Arncliffe
The proponent seeks consent for a concept masterplan and early works on the former Kogarah Golf Club site at 13-19A Marsh Street, Arncliffe, in the Bayside council area. The masterplan would set building envelopes, land uses and a maximum gross floor area of up to 343,250 m² across five blocks, mainly logistics, with some mixed-use and a possible data centre. The portal says buildings would be up to 70 m tall. Early works would include demolition, vegetation clearing, remediation, bulk earthworks and flood mitigation. The environmental impact statement (EIS) says the project would support 1,750 to 2,890 ongoing jobs. No capital investment is stated.
The EIS is dated 9 Jun 2026. The proposal drew 655 submissions: 593 objecting, 3 supporting and 59 commenting. The proponent is now responding to those submissions. Next, the department assesses the proposal and decides it or recommends a decision. Each building would need its own later development application.
- Maximum gross floor area
- 343,250 m²EIS - Final
- Maximum building height
- 70 mPortal page
- Ongoing jobs (lower end)
- 1,750 jobsEIS - Final
- Ongoing jobs (upper end)
- 2,890 jobsEIS - Final
- Public submissions
- 655 submissionsPortal page
- Submissions objecting
- 593 submissionsPortal page
The department's description
Concept proposal and stage one development application for the former Kogarah Golf Club, including:
• Concept Proposal, including 5 blocks up to 70m tall for a variety of potential uses
• Stage 1 development, including site preparation works.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
655 submissions: 633 from the public, 20 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
73 documents in 6 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs4
SEARs5
EIS47
- Appendix A - SEARs Compliance Table
- Appendix AA - BCA Assessment Report
- Appendix B - Statutory Compliance Table
- Appendix BB - Sustainability Report
- Appendix C - Stakeholder Engagement Table
- Appendix CC - Social Impact Assessment
- Appendix D - Consolidated Mitigation Measures
- Appendix DD - Biodiversity Development Assessment Report
- Appendix E - Detailed Survey Plan
- Appendix EE - ACHAR (REDACTED)
- Appendix F - Building Envelope Drawings
- Appendix FF - HAA (REDACTED)
- Appendix G - Architectural Design Report (Part 1)
- Appendix G - Architectural Design Report (Part 2)
- Appendix GG - Statement of Heritage Impact
- Appendix H - Architectural Reference Scheme Drawings
- Appendix HH - Civil Engineering Report
- Appendix I - Landscape Design Report
- Appendix II - Flood Report
- Appendix J - Landscape Reference Scheme Drawings
- Appendix JJ - Geotechnical Investigation
- Appendix K - Connecting with Country Framework
- Appendix KK - Acid Sulfate Soils Assessment
- Appendix L - Urban Design Guidelines
- Appendix LL - Salinity and Erosion Investigation
- Appendix M - Arboricultural Impact Assessment
- Appendix MM - Preliminary Site Investigation
- Appendix N - Civil Drawings
- Appendix NN - Detailed Site Investigation
- Appendix O - Flora Street Landscape Drawings
- Appendix OO - Remediation Action Plan
- Appendix P - Clause 4.6 Variation Request
- Appendix PP - Service Infrastructure Report
- Appendix Q - Engagement Report
- Appendix QQ - Preliminary Water Servicing Strategy
- Appendix R - Visual and View Impact Assessment
- Appendix S - Aeronautical Impact Assessment
- Appendix T - Wind Shear & Turbulence Assessment
- Appendix U - Economic Impact Assessment
- Appendix V - Transport Impact Assessment
- Appendix W - Noise and Vibration Impact Assessment
- Appendix X - Air Quality Impact Assessment
- Appendix Y - Preliminary Hazard Analysis
- Appendix Z - Fire Engineering Report
- Application_20260522080616
- EIS - Final
- Estimated Development Cost Report
Response to Submissions2
Agency Advice14
- EIS - Ausgrid Submission
- EIS - Bayside Council - Final Submission
- EIS - CASA Advice
- EIS - DCA TA Biodiversity Advice
- EIS - DCA TA Water Advice
- EIS - DCCEEW MCEF Group Advice
- EIS - DPIRD Fisheries Advice
- EIS - FRNSW Advice
- EIS - HNSW ACH Advice
- EIS - Heritage NSW Advice
- EIS - Inner West Council Submission
- EIS - Sydney Water Advice
- EIS - TfNSW Advice
- EIS - WaterNSW Advice
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.