On the map
State significant development

Kiar Battery Energy Storage System

A 1,000 MW battery on Hue Hue Road, Kiar

Under way: at prepare eisEnergy: batteriesRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 1,000 MW battery on Hue Hue Road, Kiar

The proponent proposes a battery energy storage system with a discharge capacity of approximately 1,000 MW and a storage capacity of approximately 4,000 MWh. It would be built on two properties at 893 and 847 Hue Hue Road, Kiar, in the Central Coast Council area, about 100 km north of the Sydney CBD. It would include battery compounds, transformers, a 33/330kV substation and a connection to an existing 330kV transmission line that runs through the site. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). A scoping report dated 6 Jun 2025 was lodged to request the Secretary's environmental assessment requirements (SEARs), which have since been issued, with supplementary SEARs. No submissions have been made yet. Next, the proponent completes the EIS, which is then exhibited so the public can make submissions. The department then assesses the project.

Battery power capacity
1,000 MWScoping Report
Battery storage capacity
4,000 MWhScoping Report
Distance from Sydney CBD
100 kmScoping Report

The department's description

Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 1000 MW / 4000 MWh, and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.