On the map
State significant infrastructure

Kerrawary Power Station - Lateral Gas Pipeline

A 35 km underground gas pipeline near Marulan

Under way: at prepare eisEnergy: otherRegional scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Agency advice on SEARs - Gas Pipeline on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 35 km underground gas pipeline near Marulan

The proponent proposes an underground gas pipeline of 35 km, linking the existing Moomba Sydney pipeline to the proposed Kerrawary Gas Fired Power Station near Marulan. It would run across rural land between Marulan and Big Hill in the Upper Lachlan Shire and Goulburn Mulwaree council areas. It includes offtake, compression and metering equipment, and the route crosses more than 20 watercourses. No capital investment or job numbers are stated.

The project is State significant infrastructure. A scoping report was lodged and agencies gave advice on 2 Oct 2026. The Secretary's environmental assessment requirements (SEARs) were issued on 16 Oct 2026 and are now being amended. No public submissions have been made. Next, the proponent prepares an environmental impact statement (EIS), which is exhibited for public submissions before the department assesses it.

Pipeline length
35 kmPortal page
Watercourses crossed
20 watercoursesAgency advice on SEARs - Gas Pipeline

The department's description

To develop a 35 km underground gas pipeline from the existing Moomba Sydney pipeline to the Kerrawary Gas Fired Power Station near Marulan and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.