Karangi Battery Energy Storage System

A 240 MW battery on Casuarina Lane, Karangi

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 240 MW battery on Casuarina Lane, Karangi

The proponent proposes a battery energy storage system with a capacity of 240 MW and 960 MWh, about four hours of storage, at 50 Casuarina Lane, Karangi, in the Coffs Harbour City area. The site is about 39.40 ha, with the buildings and equipment in a development area of about 25 ha. The project would include a substation and a new cable to the existing Coffs Harbour 330 kV substation. No capital investment or job numbers are stated.

The case is at the stage of preparing an environmental impact statement (EIS). A scoping report was lodged and the Secretary's environmental assessment requirements (SEARs) were issued on 28 Aug 2026, with advice from agencies including the council, Transport for NSW and WaterNSW. Next, the proponent prepares the EIS, which is then exhibited for public submissions. No submissions have been made yet.

Battery power capacity
240 MWScoping Report
Battery storage capacity
960 MWhScoping Report
Project site area
39.4 haScoping Report
Development area
25 haScoping Report

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 240 MW / 960 MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.