On the map
State significant development

Kangaroo Valley Battery Energy Storage System

A 400 MW battery at 325 Bendeela Road, Kangaroo Valley

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 400 MW battery at 325 Bendeela Road, Kangaroo Valley

The proponent proposes a battery energy storage system of up to 400 MW and 1,600 MWh at 325 Bendeela Road, Kangaroo Valley, in the Shoalhaven City Council area. The development site is about 15 ha. It would have containerised batteries, power conversion equipment, a control building and an overhead transmission line to the Kangaroo Valley substation. Construction is expected to take about 12 months and to create up to 60 jobs at the peak, with 2-3 ongoing roles. No capital investment is stated.

The proponent's scoping report is dated 10 Dec 2024, and the Secretary's environmental assessment requirements (SEARs) were issued in January 2025. The case is now at the stage of amending those requirements. No submissions have been made. Next, the proponent prepares an environmental impact statement (EIS), which is then exhibited so the public can make submissions. The department then assesses the project.

Battery power capacity
400 MWScoping Report
Battery storage capacity
1,600 MWhScoping Report
Development site area
15 haScoping Report
Peak construction jobs
60 jobsScoping Report
Construction period
12 monthsScoping Report

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 400MW/1600MWh and ancillary infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.