On the map
State significant development

Junction Rivers Wind Farm (formerly Burrawong Wind Farm)

A 750 MW wind farm with 96 turbines at Kyalite, Murray River

Under way: at assessmentEnergy: windRegional scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Junction Rivers Wind Project - EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 750 MW wind farm with 96 turbines at Kyalite, Murray River

The proponent proposes a wind farm of about 750 MW on Balranald Road, Kyalite, in the Murray River Council area, about 15 km south of Balranald. It would have up to 96 turbines of up to 300 m, plus up to four battery systems or voltage-control devices and ancillary works. The development footprint is about 768 ha within a project area of around 16,367 ha. The environmental impact statement (EIS) of May 2024 expects up to 650 jobs at peak construction and about 40 operational jobs. No capital investment is stated.

The EIS was exhibited and drew 193 submissions: 187 objecting, 4 supporting and 2 commenting. The proponent has since responded to submissions. The portal lists a request for additional information dated 9 Jul 2026, and the case is at the more information required stage. Next, the department assesses the project and prepares its report. The decision is made by the Minister or the Independent Planning Commission.

Generation capacity
750 MWPortal page
Wind turbines
96 turbinesPortal page
Peak construction jobs
650 jobsJunction Rivers Wind Project - EIS
Operational jobs
40 jobsJunction Rivers Wind Project - EIS
Development footprint
768 haJunction Rivers Wind Project - EIS
Project area
16,367 haJunction Rivers Wind Project - EIS
Submissions objecting
187 submissionsPortal page

The department's description

Development of a 750 MW wind farm, including 96 turbines (up to 300m), battery storage and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

193 submissions: 180 from the public, 10 from organisations and 3 from public authorities

Object187
Support4
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

70 documents in 7 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs5
SEARs3
EIS25
Response to Submissions18
Agency Advice17
Additional Information1

What's near it

Where it is

Suburb
Kyalite
Council area
Murray River

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.