Junction Rivers Wind Farm (formerly Burrawong Wind Farm)
A 750 MW wind farm with 96 turbines at Kyalite, Murray River
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its Junction Rivers Wind Project - EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 750 MW wind farm with 96 turbines at Kyalite, Murray River
The proponent proposes a wind farm of about 750 MW on Balranald Road, Kyalite, in the Murray River Council area, about 15 km south of Balranald. It would have up to 96 turbines of up to 300 m, plus up to four battery systems or voltage-control devices and ancillary works. The development footprint is about 768 ha within a project area of around 16,367 ha. The environmental impact statement (EIS) of May 2024 expects up to 650 jobs at peak construction and about 40 operational jobs. No capital investment is stated.
The EIS was exhibited and drew 193 submissions: 187 objecting, 4 supporting and 2 commenting. The proponent has since responded to submissions. The portal lists a request for additional information dated 9 Jul 2026, and the case is at the more information required stage. Next, the department assesses the project and prepares its report. The decision is made by the Minister or the Independent Planning Commission.
- Generation capacity
- 750 MWPortal page
- Wind turbines
- 96 turbinesPortal page
- Peak construction jobs
- 650 jobsJunction Rivers Wind Project - EIS
- Operational jobs
- 40 jobsJunction Rivers Wind Project - EIS
- Development footprint
- 768 haJunction Rivers Wind Project - EIS
- Project area
- 16,367 haJunction Rivers Wind Project - EIS
- Submissions objecting
- 187 submissionsPortal page
The department's description
Development of a 750 MW wind farm, including 96 turbines (up to 300m), battery storage and ancillary infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
193 submissions: 180 from the public, 10 from organisations and 3 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
70 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs5
SEARs3
EIS25
- Appendix 01 - SEARS and Controlled Action Determination
- Appendix 02 - Schedule of Lands
- Appendix 03 - EPBC Protected Matters Report (20240416)
- Appendix 04 - Haulage Route Assessment
- Appendix 05 - Statutory Requirements
- Appendix 06 - Social Impact Assessment
- Appendix 07 - Record of Stakeholder Engagement
- Appendix 08 - Summary of Management and Mitigation Measures
- Appendix 09 - Landscape and Visual Impact Assessment
- Appendix 10 - Noise Assessment
- Appendix 11 - Biodiversity Development Assessment Report
- Appendix 12 - Aboriginal Cultural Heritage Assessment
- Appendix 13 - Historical Heritage Impact Assessment
- Appendix 14 - Traffic and Transport Assessment
- Appendix 15 - Water Resources Impact Assessment
- Appendix 16 - Flood Impact Risk Assessment
- Appendix 17 - Land Use Conflict Risk Assessment
- Appendix 18 - Aviation Impact Assessment
- Appendix 19 - EMI
- Appendix 20 - Preliminary Hazards Assessment
- Appendix 21 - Blade Throw Study
- Appendix 22 - Economic Impact Assessment
- Appendix 23 - Cumulative Impact Scoping Summary
- Application Form
- Junction Rivers Wind Project - EIS
Response to Submissions18
- Appendix 01 - Submissions Register
- Appendix 02 - Additional Consultation Register
- Appendix 03 - Obstacle Lighting Plan and Aviation Response
- Appendix 04 Amended BDAR
- Appendix 05 - Updated Traffic and Transport Assessment
- Appendix 06 - Updated Transport Route Analysis
- Appendix 07 - Strategic Concept Designs
- Appendix 08 - Additional Noise Assessment
- Appendix 09 - EIS Noise Impact Assessment
- Appendix 10 - Addendum LVIA
- Appendix 11 - HeritageNSW Response and Addendum Report
- Appendix 12 - Spray Drift Assessment
- Appendix 13 - Telecommunications Response
- Appendix 14 - Summary of Management and Mitigation Measures
- Appendix 15 - Blade Throw Response
- Appendix 16 - Qantac Letter of Support
- Junction Rivers Wind Project Submission Report
- Request RTS Letter
Agency Advice17
- Advice on EIS - Airservices
- Advice on EIS - BCS
- Advice on EIS - CASA
- Advice on EIS - Crown Lands
- Advice on EIS - DPI Agriculture
- Advice on EIS - DPI Fisheries
- Advice on EIS - EPA
- Advice on EIS - FRNSW
- Advice on EIS - HNSW ACH
- Advice on EIS - Heritage Council
- Advice on EIS - MDBA
- Advice on EIS - MEG
- Advice on EIS - NSW DCCEEW Water
- Advice on EIS - NSW Health
- Advice on EIS - RFS
- Advice on EIS - TfNSW
- Advice on EIS - WaterNSW
Additional Information1
What's near it
Where it is
- Suburb
- Kyalite
- Council area
- Murray River
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.