On the map
State significant development

ISP Abattoir Cowra

A new abattoir at 6649 Olympic Highway, Cowra

Under way: at prepare eisAgricultureDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its 1396_PSA_ISP_Final Scoping Report_221028_V6 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A new abattoir at 6649 Olympic Highway, Cowra

The proponent proposes a new livestock processing plant (abattoir) at 6649 Olympic Highway, Cowra, next to an existing abattoir that would keep operating. At full operation it could process up to 7,200 head of small stock (lamb, mutton, goat) and 400 head of cattle a day, about 90,000 tonnes of carcass a year. The scoping report says it would create about 500 jobs. The site is in an industrial zone about 3.5 km south-west of the Cowra town centre, and the nearest homes are about 250 m to the west. No capital investment is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, and the scoping report is dated 28 Oct 2022. No submissions have been made yet. Next, the EIS is to be exhibited so the public can make submissions. The department then assesses the project and decides it.

Small stock processed a day
7,200 head1396_PSA_ISP_Final Scoping Report_221028_V6
Cattle processed a day
400 head1396_PSA_ISP_Final Scoping Report_221028_V6
Annual carcass capacity
90,000 tonnes a yearPortal page
Operational jobs
500 jobs1396_PSA_ISP_Final Scoping Report_221028_V6
Distance from Cowra town centre
3.5 km1396_PSA_ISP_Final Scoping Report_221028_V6

The department's description

Construction and operation of a livestock processing plant (abattoir) with the capacity to process up to 7,200 head of small stock (lamb, mutton, goat) and 400 head of cattle per day totally 90,000 tonnes of carcass per year.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

5 documents in 3 folders, each on the NSW Planning Portal

Early Consultation1
Request for SEARs1
SEARs3

What's near it

Where it is

Suburb
Cowra
Council area
Cowra

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.