IRT Woonona Redevelopment
92 seniors homes and care upgrades at Popes Road, Woonona
Where it is in the process
Approved on 17 Apr 2026
What it proposes
AI summary. Written from this project's page and its SSD-73910208 Assessment Report and SSD-73910208 Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
92 seniors homes and care upgrades at Popes Road, Woonona
The project adds five four-storey buildings with 92 independent living units, a basement car park and a wellness centre to an existing seniors housing site at 4-6 Popes Road, Woonona, in Wollongong City. It also upgrades the residential care facility, cutting its rooms from 102 to 100, and reuses a local heritage-listed former church as a restaurant. The estimated development cost is $121,999,198, with 190 construction jobs and 91 operational jobs.
The environmental impact statement was exhibited from 29 Jul 2025 to 26 Aug 2025. It drew 3 submissions: 1 objecting and 2 commenting. The proponent responded and amended the project on 10 Dec 2025. A director of the department, as the Minister's delegate, approved it on 17 Apr 2026 with conditions. Next, the proponent must meet those conditions before construction certificates are issued.
- Estimated development cost
- $122MSSD-73910208 Assessment Report
- Independent living units
- 92 dwellingsSSD-73910208 Assessment Report
- Construction jobs
- 190 jobsSSD-73910208 Assessment Report
- Operational jobs
- 91 jobsSSD-73910208 Assessment Report
- Car parking spaces
- 155 car spacesSSD-73910208 Assessment Report
- Site area
- 29,066 m²SSD-73910208 Assessment Report
- Proposed total floor area
- 18,695 m²SSD-73910208 Assessment Report
The department's description
Redevelopment of IRT Woonona to provide new independent living units and upgrade the residential care facility.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
3 submissions: 1 from the public, 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
138 documents in 9 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
SEARs1
EIS53
- Appendix A - SEARs Compliance Table
- Appendix AA - Shelter in Place Strategy
- Appendix B - Clause 4.6 Variation Statement
- Appendix BB - Social Impact Assessment
- Appendix C - ACHAR
- Appendix CC - Statement of Heritage Impact
- Appendix D - Access Report
- Appendix DD - Stormwater Management Report
- Appendix DD - Stormwater Sediment and Erosion Control Plans
- Appendix E - Arboricultural Impact Assessment
- Appendix EE - Surface and Groundwater Impact Assessment
- Appendix F - Architectural Drawings Part 1A
- Appendix F - Architectural Drawings Part 1B
- Appendix F - Architectural Drawings Part 2
- Appendix G - BASIX Certificate
- Appendix G - Summary Certificate
- Appendix G - Thermal Modelling Results and Specs
- Appendix GG - Transport and Accessibility Impact Assessment
- Appendix H - BCA Compliance Statement
- Appendix HH - Urban Design Report
- Appendix I - BDAR
- Appendix II - VIA Appendix A
- Appendix II - Visual Impact Assessment
- Appendix J - CPTED
- Appendix JJ - Construction and Demolition WMP
- Appendix JJ - Operational Waste Management Plan
- Appendix K - Design Report Part 1
- Appendix K - Design Report Part 2
- Appendix KK - Water Management Plan
- Appendix L - ADG Conformance
- Appendix L - SDRP Response Report
- Appendix L - Senior Design Guide Conformance
- Appendix M - Detailed Site Investigation
- Appendix MM - Mitigation Measures
- Appendix N - Ecologically Sustainable Development Report
- Appendix O - Community Engagement Report
- Appendix Q - Flood Emergency Response Plan
- Appendix R - Flood Impact Assessment
- Appendix S - Additional Geotechnical Assessment Report
- Appendix S - Geotechnical Site Investigation Report
- Appendix S - Hydrological Assessment Report
- Appendix T - Hazardous Material Survey
- Appendix U - Canopy Coverage
- Appendix U - Landscape Concept Plan
- Appendix U - Landscape Report
- Appendix V - Demolition Noise Vibration MP
- Appendix V - Noise Impact Assessment
- Appendix W - Pedestrian Wind Environment Assessment
- Appendix X - Preliminary Hazard Analysis
- Appendix Y - Preliminary Site Investigation
- Appendix Z - Hydraulic Fire Report
- Appendix Z - Services Availability Review
- SSD-73910208 Environmental Impact Statement
Agency Advice11
Amendments39
- Appendix A - Submissions Register
- Appendix AA - Heritage NSW Response Letter
- Appendix B - Architectural Plans
- Appendix BB - Updated ACHAR
- Appendix C - Architectural Response Letter
- Appendix CC - Updated BCA & DDA Capability Statement
- Appendix D - Clause 4.6 Report (FSR)
- Appendix DD - Easement Plan
- Appendix E - Updated Clause 4.6 Report - Height
- Appendix EE - Survey Plan
- Appendix F - Architectural Drawings - 50% DD
- Appendix FF - Section 107 of the Housing SEPP Assessment
- Appendix G - Updated Landscape Drawings
- Appendix GG - Photographs of Demolished Buildings
- Appendix H - Landscape Response Letter
- Appendix HH - Vegetative Management Plan
- Appendix I - Riparian Offset Strategy
- Appendix II - Peer Review of the Flood Assessment and FERP
- Appendix J - Landscape Visuals
- Appendix JJ - Additional Geotechnical Investigation.Report
- Appendix K - Updated Arboricultural Report
- Appendix KK - Channel Section
- Appendix L - Updated Stormwater Management Report
- Appendix M - Flood Letter
- Appendix N - Stormwater Response Letter (Memo 1)
- Appendix O - Stormwater Response Letter (Memo 2)
- Appendix P - Bulk Earthworks Plan
- Appendix Q - Structural Response Letter
- Appendix R - Basement Secant Shoring Options
- Appendix S - Waste Response Letter
- Appendix T - Traffic Response Letter
- Appendix U - Updated Visual Impact Assessment
- Appendix V - Visual Impact Response Letter
- Appendix W - Updated Flood Emergency Response Plan
- Appendix X - Flood Emergency Response Plan Response Letter
- Appendix Y - Updated Statement of Heritage Impact Report
- Appendix Z - Heritage Response Letter
- SSD-73910208 Amendment Acceptance Letter
- SSD-73910208 Response to Submissions and Amendment Report
Additional Information20
- Appendix A - Submissions Register
- Appendix B - Architectural Plans
- Appendix C - Architectural Response
- Appendix D - Landscape Plans
- Appendix E - Landscape Response Letter
- Appendix F - Landscape Visual
- Appendix G - Bulk Earthworks Plan
- Appendix H - AIA
- Appendix I - Traffic Response Letter
- Appendix J - Flood Response (ACOR)
- Appendix K - Stormwater Response
- Appendix L - Structural Response
- Appendix M - Heritage Response (No watermark)
- Appendix N - SoHI (No watermark)
- Appendix O - Flooding Peer Review Letter
- Appendix P - FERP Response Letter
- Appendix Q - Updated FERP
- Appendix R - 50% DD Plans (Church)
- Appendix S - Clause 4.6 Variation (FSR)
- SSD-73910208 Response to Submissions and Amendment Report
Determination6
What's near it
Where it is
- Suburb
- Woonona
- Council area
- Wollongong
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.