State significant development

Ingham Battery Energy Storage System

A 40 MW battery at 475 Badgerys Creek Road, Bradfield

Under way: at prepare eisEnergy: batteriesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 40 MW battery at 475 Badgerys Creek Road, Bradfield

The proponent proposes a battery energy storage system of about 40 MW and 240 MWh, with associated infrastructure, at 475 Badgerys Creek Road, Bradfield, in the Liverpool City Council area. It would supply an embedded network for a planned enterprise and light industry estate within the Western Sydney Aerotropolis. The development area is about 0.95 ha, and the battery equipment would occupy 0.74 ha. It may be built in two to four stages. No capital investment is stated, though the scoping report says the estimated cost is over $30 million.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report is dated October 2026, and the Secretary's environmental assessment requirements (SEARs) have been issued, with advice from agencies. No submissions have been made yet. Next, the proponent lodges the EIS, which is exhibited for public submissions before the department assesses it.

Battery power capacity
40 MWScoping Report
Battery storage capacity
240 MWhScoping Report
Development area
0.95 haScoping Report
Battery site area
0.74 haScoping Report

The department's description

Construction, operation and decommissioning of a Battery Energy Storage System (BESS) with an up to 40 Megawatt (MW) maximum power output capacity with 6-hour duration (240 MWh) and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.