Homewood Care Seniors (Bexley)
A 54-room aged care extension at Regent Street, Bexley
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 54-room aged care extension at Regent Street, Bexley
Homewood Care proposes a new part two, part three storey residential aged care building at 56-58 Regent Street, Bexley, in the Bayside Council area, joined to its existing facility at 62-64 Iliffe Street. The environmental impact statement (EIS) gives 7,340 m² of floor area and 176 registered beds, with 36 basement car spaces, on a site of 6,069 m². The portal description says it adds 54 rooms with private ensuites. No capital investment is stated, although the residential part is said to cost more than $30 million.
The EIS is dated 24 July 2026, and the proposal was exhibited, with a notice advertised on 18 Aug 2026. It drew 9 submissions: 7 objecting, 1 supporting and 1 commenting. The proponent has since responded to submissions and amended the plans. The department is now assessing it, with advice from other agencies. Next come the department's assessment report and a decision.
- Additional rooms
- 54 roomsPortal page
- Total operational beds after the project
- 179 bedsPortal page
- Registered beds in the new building
- 176 bedsEnvironmental Impact Statement
- Gross floor area
- 7,340 m²Environmental Impact Statement
- Basement car spaces
- 36 car spacesEnvironmental Impact Statement
- Site area
- 6,069 m²Environmental Impact Statement
The department's description
The proposed development will deliver an additional 54 rooms with private ensuites, with the existing two (2) Homewood Care facilities currently accommodating 125 licensed beds, for a total of 179 operational beds on the site.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
9 submissions: 8 from the public and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
56 documents in 6 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS33
- Appendix 1 - SEARs
- Appendix 10 - Architectural Plans
- Appendix 11 - Design Report
- Appendix 12 - Landscape Plan
- Appendix 13 - Preliminary Site Investigation
- Appendix 14 - Geotechnical Report
- Appendix 15 - Dewatering Management Plan
- Appendix 17 - Integrated Water Cycle Management Report
- Appendix 18 - Flood Impact Risk Letter
- Appendix 19 - Civil Engineering Design
- Appendix 2 - SEARs Table
- Appendix 20 - Transport Impact Assessment
- Appendix 21 - BCA Assessment Report
- Appendix 22 - Accessibility Report
- Appendix 23 - Noise and Vibration Impact Assessment
- Appendix 24 - Visual Impact Assessment
- Appendix 25 - Waste Management Plan
- Appendix 26 - Section J Asessment
- Appendix 27 - BDAR Wavier Request
- Appendix 29 - Aboriginal Heritage Assessment (redacted)
- Appendix 3 - Statutory Compliance Table
- Appendix 30 - Environmentally Sustainable Design Report
- Appendix 31 - Arboricultural Impact Assessment Report
- Appendix 32 - Social Impact Assessment
- Appendix 33 - Plan of Management
- Appendix 34 - BDAR Wavier
- Appendix 4 - Mitigation Measures
- Appendix 5 - Clause 4.6 Variation (Height)
- Appendix 6 - Clause 4.6 Variation (FSR)
- Appendix 7 - Engagement Report
- Appendix 8 - Engagement Summary Table
- Appendix 9 - Survey Plan
- Environmental Impact Statement
Response to Submissions18
- Appendix 10.1 - Architectural Plans
- Appendix 11.1 - Design Report
- Appendix 12.1 - Landscape Plan
- Appendix 14a - Groundwater Montioring
- Appendix 17.1 - Integrated Water Cycle Management Report
- Appendix 18a - Flood Compliance Letter
- Appendix 19.1 - Civil Documentation
- Appendix 19a - DRAINS Model Design
- Appendix 19b - MUSIC Model Design
- Appendix 20a - Traffic Letter
- Appendix 23.1 - Noise and Vibration Impact Assessment
- Appendix 34.1 - Amended Plan of Management
- Appendix 35 - Response to DCA Technical Advisory Advice
- Appendix 4.1 - Amended Mitigation Measures
- Appendix 5.1 - Clause 4.6 Variation (Height)
- Appendix 6.1 - Clause 4.6 Variation (FSR)
- Request RTS Letter
- Response to Submissions Report
Agency Advice2
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.