On the map
State significant development

Homebush Battery Energy Storage System

A 200 MW battery at 10 Homebush Bay Drive, Homebush

Decided: approved on 7 Aug 2026Energy: batteriesDistrict scale

Where it is in the process

Approved on 7 Aug 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination7 Aug 2026 (done)
  9. Approved7 Aug 2026

What it proposes

AI summary. Written from this project's page and its IPC - Instrument of Determination and Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 200 MW battery at 10 Homebush Bay Drive, Homebush

Ausgrid proposed a battery energy storage system with a capacity of 200 MW and 431 MWh at 10 Homebush Bay Drive, Homebush, in the Strathfield Council area. It would sit beside the existing Mason Park substation, on a site of 6.2 ha with a development footprint of 2.95 ha. Construction would take about 22 months. The department gives a capital investment of $215 million, up to 100 construction jobs and 1 operational job.

The environmental impact statement (EIS) was exhibited from 19 Jun 2025 to 21 Jul 2025 and drew 63 submissions: 59 objecting, 1 supporting and 3 commenting. The proponent responded and made minor layout changes. The department's assessment report of July 2026 found it approvable subject to conditions. The Independent Planning Commission approved it on 7 Aug 2026. Next, the proponent must meet the conditions, including a voluntary planning agreement with the council, before construction.

Capital investment
$215MAssessment Report
Battery power capacity
200 MWAssessment Report
Battery storage capacity
431 MWhAssessment Report
Construction jobs
100 jobsAssessment Report
Operational jobs
1 jobsAssessment Report
Site area
6.2 haAssessment Report
Development footprint
2.95 haAssessment Report
Construction period
22 monthsAssessment Report

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 200MW/431MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

63 submissions: 51 from the public, 11 from organisations and 1 from public authorities

Object59
Support1
Comment3

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

1 change to the project after its decision, each assessed as a case of its own, newest first.

MOD 1 - Change in BESS TechnologySSD-77443244-Mod-1

Under way: at prepare mod report

Modification to the battery technology to a 150 MW / 600 MWh BESS.

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

80 documents in 10 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs2
SEARs1
EIS13
Response to Submissions9
Agency Advice32
Additional Information7
Recommendation3
Determination2
Management Plans and Strategies10

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.