Where it is in the process

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 120 MW battery on the Oxley Highway, Carroll, near Gunnedah

The proponent proposes a battery energy storage system with a capacity of up to 120 MW and 480 MWh, on rural land at 6596 Oxley Highway, Carroll, about 7.5 km east of Gunnedah in the Gunnedah Shire. It would include a substation, inverters and transformers, internal access tracks and a new transmission line of about 1,300 m to the existing Gunnedah substation. The site is about 17 ha, with a development footprint of about 11 ha. No capital investment or job numbers are stated.

The proponent lodged a scoping report, dated 1 Dec 2023, and the Secretary's environmental assessment requirements (SEARs) were issued after advice from agencies and the council. The portal now shows the SEARs as expired. No environmental impact statement is listed and there are no public submissions. The case cannot move to exhibition or assessment unless the proponent lodges an environmental impact statement.

Battery power capacity
120 MWScoping Report
Battery storage capacity
480 MWhScoping Report
Nominal site area
17 haScoping Report
Development footprint
11 haScoping Report
Transmission line length
1,300 mScoping Report

The department's description

Development of a 120 MW / 480 MWh battery energy storage system and associated infrastructure and connection works

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.