On the map
State significant development

Good Earth Green Hydrogen and Ammonia Project

A green hydrogen and ammonia plant on the Gwydir Highway, Moree

Decided: approved on 23 Feb 2026Industry and warehousesNeighbourhood scale

Where it is in the process

Approved on 23 Feb 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination23 Feb 2026 (done)
  9. Approved23 Feb 2026

What it proposes

AI summary. Written from this project's page and its GEGHA Project - Assessment Report and GEGHA Project - Development Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A green hydrogen and ammonia plant on the Gwydir Highway, Moree

The project is a green hydrogen and ammonia production and storage facility at 2910 and 2912 Gwydir Highway, about 24 kilometres south-west of Moree in the Moree Plains Shire. It has an estimated development cost of $71 million. It would produce up to 2,200 tonnes a year of hydrogen and 4,500 tonnes a year of ammonia, using power from the adjacent solar farm. It would create up to 60 construction jobs and 10 operational jobs on a site of about 178 ha.

The environmental impact statement was exhibited from 18 Jun 2025 to 15 Jul 2025 and drew 40 submissions, all objecting. The proponent responded in November 2025. The department's assessment found it approvable, focusing on hazards and risk and on water management. A department Executive Director, as the Minister's delegate, approved it on 23 Feb 2026, with conditions. Next, the proponent must meet those conditions, including hazard studies before construction starts.

Capital investment
$71MGEGHA Project - Assessment Report
Hydrogen production limit
2,200 tonnes a yearGEGHA Project - Assessment Report
Ammonia production limit
4,500 tonnes a yearGEGHA Project - Assessment Report
Construction jobs
60 jobsGEGHA Project - Assessment Report
Operational jobs
10 jobsGEGHA Project - Assessment Report
Site area
178 haGEGHA Project - Assessment Report
Hydrogen electrolyser capacity
15 MWPortal page
Public submissions
40 submissionsPortal page

The department's description

Construction and operation of a green hydrogen and ammonia production and storage facility, including:

- a 15-megawatt hydrogen electrolyser

- a 16 tonne per day ammonia production plant

- associated storage facilities and site infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

40 submissions: 30 from the public and 10 from organisations

Object40
Support0
Comment0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

80 documents in 10 folders, each on the NSW Planning Portal

Notice of Exhibition1
Early Consultation2
SEARs4
EIS32
Response to Submissions12
Agency Advice18
Determination4
Management Plans and Strategies4
Notifications1
Other Documents2

What's near it

Where it is

Suburb
Moree
Council area
Moree Plains

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.