On the map
State significant development

Gazcorp Industrial Estate

Decided: approved on 11 Nov 2019Industry and warehouses

Where it is in the process

Approved on 11 Nov 2019

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination11 Nov 2019 (done)
  9. Approved11 Nov 2019

What it proposes

The portal gives no description.

Submissions

What the public, organisations and public authorities said, counted by where they stood.

7 submissions: 4 from the public and 3 from organisations

Object6
Support0
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

7 changes to the project after its decision, each assessed as a case of its own, newest first.

SSD-5248 Modification 4 - Lots 13 and 14SSD-5248-Mod-3

Withdrawn: withdrawn

Amendment to concept to create Lots 13A , 13B, 14A and 14B, increase building heights, increase in GFA, reconfiguration of stormwater and water quality systems and additional driveways

Its page on the Planning Portal

Modification 7 - Revisions to Lot Layouts, Estate Roads and Stage 1 EarthworksSSD-5248-Mod-7

Decided: approved on 20 Mar 2026 by the department (team leader)

• Lot 2 adjusted floor area and warehouse mezzanine • Lot 3 adjusted floor area and warehouse mezzanine • Lot 6 reconfigured to create 3 warehouses - Lot 5, Lot 6A and Lot 6B • Alteration to Estate Road 03 • Modification of Stage 1 earthworks

Its 26 documents

26 documents in 6 folders, each on the NSW Planning Portal

Uncategorised1

See the document on the Planning Portal

Modification Application8

See the 8 documents on the Planning Portal

Agency Advice10

See the 10 documents on the Planning Portal

Additional Information4

See the 4 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Gazcorp Industrial Estate MOD 6 - AdditionsSSD-5248-Mod-6

Decided: approved on 28 Mar 2025 by the department (team leader)

- Rearrange and redistribute floor space across Lots 1-9. - Add food and drink premises adjacent to Lot 1 - Increase height limit of buildings on Lots 1-9. - Associated alterations to the eastern part of internal estate road.

Its 35 documents

35 documents in 5 folders, each on the NSW Planning Portal

Modification Application13

See the 13 documents on the Planning Portal

Agency Advice10

See the 10 documents on the Planning Portal

Additional Information9

See the 9 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Gazcorp Industrial Estate MOD 5 - Design ChangesSSD-5248-Mod-5

Decided: approved on 29 May 2024 by the department (director)

Amendment to concept to create Lots 13A , 13B, 14A and 14B, increase building heights, increase in GFA, reconfiguration of stormwater and water quality systems and additional driveways

Its 43 documents

43 documents in 5 folders, each on the NSW Planning Portal

Modification Application7

See the 7 documents on the Planning Portal

Agency Advice11

See the 11 documents on the Planning Portal

Additional Information22

See the 22 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Gazcorp Industrial Estate MOD 4 - Layout ChangesSSD-5248-Mod-4

Decided: approved on 12 Dec 2023 by the department (team leader)

Amendments to Warehouse 10 including changes to site layout and a partial temperature-controlled

Its 35 documents

35 documents in 5 folders, each on the NSW Planning Portal

Modification Application11

See the 11 documents on the Planning Portal

Agency Advice8

See the 8 documents on the Planning Portal

Additional Information13

See the 13 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Gazcorp Industrial Estate MOD 2 - Lot AmalgamationSSD-5248-Mod-2

Decided: approved on 22 Dec 2022 by the department (director) · 8 submissions

Amalgamation of Lots 11, 12 and parts of Lot 13 to create a new Lot 11 and amendment to building height control applicable to Lot 11 to facilitate a proposed warehouse and distribution centre, reduction of the approved gross floor area.

Its 68 documents

68 documents in 7 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application27

See the 27 documents on the Planning Portal

Response to Submissions29

See the 29 documents on the Planning Portal

Agency Advice6

See the 6 documents on the Planning Portal

Additional Information1

See the document on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Gazcorp Industrial Estate MOD 1 - Revised LayoutSSD-5248-Mod-1

Decided: approved on 23 Dec 2021 by the department (director) · 11 submissions

Modifications to the approved Concept Plan and carrying out earthworks across the site as part of the Stage 1 development.

Its 33 documents

33 documents in 6 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application12

See the 12 documents on the Planning Portal

Response to Submissions4

See the 4 documents on the Planning Portal

Agency Advice5

See the 5 documents on the Planning Portal

Additional Information7

See the 7 documents on the Planning Portal

Determination4

See the 4 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.