Four Mile Creek Wind Farm

A 157.5 MW wind farm with up to 21 turbines, Canobolas State Forest

Under way: at prepare eisEnergy: windDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 157.5 MW wind farm with up to 21 turbines, Canobolas State Forest

The proponent proposes a wind farm with up to 21 wind turbines, each with a blade tip up to 250 m above ground, in the Canobolas State Forest, about 6.7 km south-west of Orange in the Cabonne Shire. It would have an installed capacity of up to 157.5 MW. About 4.32 km of overhead transmission line would connect an on-site substation to a new switching station beside an existing 132 kV line. Construction would employ about 300 temporary workers over 2 years, with 8 permanent workers in operation. No capital investment is stated.

The proponent's scoping report is dated November 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued. The proponent is now preparing an environmental impact statement (EIS). No submissions have been made yet. The EIS is to be exhibited, and the public can then make submissions. The department then assesses the project and decides it.

Wind turbines
21 turbinesScoping Report
Maximum blade-tip height
250 mScoping Report
Installed capacity
157.5 MWScoping Report
Overhead transmission line
4.32 kmScoping Report
Construction workers
300 jobsScoping Report
Operational workers
8 jobsScoping Report

The department's description

Development of a wind farm with up to 21 wind turbines and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.