On the map
State significant development

Elysian Wind Farm Project

Withdrawn: withdrawnEnergy: windDistrict scale

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

The construction, operation and decommissioning of a wind farm with:- a maximum of 30 turbines, a maximum of 200 megawatts (MW) and maximum height of 230 metres (to blade tip) and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

What's near it

Where it is

Suburb
Tuross
Council area
Snowy Monaro Regional

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.