On the map
State significant development

Elaine Gardens Seniors Living in Point Piper

Seniors living and aged care at 550 New South Head Road, Point Piper

Under way: at prepare eisHomesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its 250829 preliminary scoping report 550 NSHRD PP on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Seniors living and aged care at 550 New South Head Road, Point Piper

The proponent proposes an integrated seniors living and healthcare precinct at 550 New South Head Road, Point Piper, in the Woollahra Municipality. The concept has about 30 independent living units, a 40-bed residential aged care facility and a health and wellbeing hub. The site is 6,894.9 m² with a proposed gross floor area of 5,584.9 m². Two layouts are being tested, one keeping the locally heritage-listed house "Elaine" and one removing it. No capital investment is stated.

The case is at the stage of preparing an environmental impact statement (EIS). The proponent's preliminary scoping report is dated August 2025, and the Secretary's environmental assessment requirements (SEARs) were issued in September 2025. No submissions have been made yet. Next, the proponent prepares the EIS, which is then exhibited for public submissions before the department assesses it.

Independent living units
30 units250829 preliminary scoping report 550 NSHRD PP
Residential aged care beds
40 beds250829 preliminary scoping report 550 NSHRD PP
Site area
6,894.9 m²250829 preliminary scoping report 550 NSHRD PP
Proposed gross floor area
5,584.9 m²250829 preliminary scoping report 550 NSHRD PP

The department's description

Proposal for 30 ILUs and 40 RAC beds with ancillary health and well being hub and community facilities.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.