Eastwood Centre, Mixed-Use Development, 152-190 Rowe Street and 3-5 Rutledge Street
682 homes in four towers at Eastwood Centre, Rowe Street
Where it is in the process
At collate submissions
What it proposes
AI summary. Written from this project's page and its Environmental Impact and Rezoning Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
682 homes in four towers at Eastwood Centre, Rowe Street
The proponent proposes to demolish the existing structures at 152-190 Rowe Street and 3-5 Rutledge Street, Eastwood, in the City of Ryde, and build four residential buildings of 8 to 30 storeys. They would sit over three levels of shops and commercial space and include 682 dwellings, with 5% of residential floor area as affordable housing for 15 years, and 1,320 basement parking spaces. A concurrent rezoning would raise height limits on Rutledge Street from 33.5 m to 112 m. No capital investment is stated.
The environmental impact and rezoning statement is dated September 2026. The Portal page shows 48 submissions: 27 objecting, 17 supporting and 4 commenting. The department is collating them. Next, the proponent responds to the submissions, possibly amending the project, and the department assesses it and prepares a report before a decision is made.
- New dwellings
- 682 dwellingsEnvironmental Impact and Rezoning Statement
- Basement parking
- 1,320 car spacesEnvironmental Impact and Rezoning Statement
- Proposed maximum height, Rutledge Street
- 112 mEnvironmental Impact and Rezoning Statement
- Current height limit, Rutledge Street
- 33.5 mEnvironmental Impact and Rezoning Statement
- Proposed maximum height, Rowe Street
- 36 mEnvironmental Impact and Rezoning Statement
- Affordable housing share
- 5% of residential floor areaEnvironmental Impact and Rezoning Statement
- Total jobs
- 1,314 jobsEnvironmental Impact and Rezoning Statement
- Non-residential floor space
- 17,096 m²Environmental Impact and Rezoning Statement
The department's description
Mixed-use development: demolition, excavation & construction of 4xRFBs with 3-levels retail/commercial podium, approximately 682 units with 5% AH for 15years. Concurrent rezoning to increase HOB on Rowe St (21m to 36m) & Rutledge St (33.5m to 112m)
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
48 submissions: 47 from the public and 1 from organisations
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
61 documents in 5 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
SEARs3
EIS53
- Appendix A - SEARs Compliance
- Appendix B - Statutory Compliance
- Appendix C - DCP Compliance
- Appendix D - Mitigation Measures
- Appendix E - EDC Report
- Appendix F - Engagement Report
- Appendix G - Design Report
- Appendix H - Architectural Drawings (Part 1 of 2)
- Appendix H - Architectural Drawings (Part 2 of 2)
- Appendix I - Connecting with Country Report
- Appendix J - Landscape Design Report
- Appendix K - Landscape Drawings
- Appendix L - Visual Impact Assessment
- Appendix M - Noise and Vibration Impact Assessment
- Appendix N - Transport Impact Assessment
- Appendix O - Geotechnical Assessment
- Appendix P - Groundwater Impact Assessment
- Appendix Q - Civil Drawings
- Appendix R - Integrated Water Management Plan
- Appendix S - Limited DSI (Part 1 of 9)
- Appendix S - Limited DSI (Part 2 of 9)
- Appendix S - Limited DSI (Part 3 of 9)
- Appendix S - Limited DSI (Part 4 of 9)
- Appendix S - Limited DSI (Part 5 of 9)
- Appendix S - Limited DSI (Part 6 of 9)
- Appendix S - Limited DSI (Part 7 of 9)
- Appendix S - Limited DSI (Part 8 of 9)
- Appendix S - Limited DSI (Part 9 of 9)
- Appendix T - Conceptual Remediation Action Plan
- Appendix U - BDAR Waiver
- Appendix V - BASIX Certificate (A&B)
- Appendix V - BASIX Certificate (C&D)
- Appendix W - Waste Management Plan
- Appendix X - ESD Report
- Appendix Y - Flood Risk Management Report
- Appendix Z - Aboriginal Heritage Due Diligence Assessment
- Appendix ZA - Statement of Heritage Impact
- Appendix ZB - CHP Supporting Statement
- Appendix ZC - Draft Public Benefit Offer
- Appendix ZD - Survey Plan
- Appendix ZE - Infra Delivery and Management Plan
- Appendix ZF - Pedestrian Wind Environment Statement
- Appendix ZF - Pedestrian Wind Environment Wind Tunnel Study
- Appendix ZG - Solar Light Reflectivity Study
- Appendix ZH - NCC Section J Report
- Appendix ZI - Hazard Analysis
- Appendix ZJ - Arboricultural Impact Assessment
- Appendix ZK - Economic Impact Assessment
- Appendix ZL - Staging Report
- Appendix ZM - Social Impact Assessment
- Appendix ZN - Public Domain Plan (PBO)
- Embodied Emissions Materials Form
- Environmental Impact and Rezoning Statement
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.