On the map
State significant development

Early Works - 19A Evans Avenue, Eastlakes

Early works for the Eastlakes Shopping Centre site, Eastlakes

Decided: approved on 6 Nov 2026HomesNeighbourhood scale

Where it is in the process

Approved on 6 Nov 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination6 Nov 2026 (done)
  9. Approved6 Nov 2026

What it proposes

AI summary. Written from this project's page and its SSD Instrument of Consent and SSD-SSI Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Early works for the Eastlakes Shopping Centre site, Eastlakes

The project is early works at 19A Evans Avenue, Eastlakes, in the Bayside Council area, ahead of a separate application for a mixed use development with housing on the site. It includes site establishment, erosion and sediment control, bulk excavation, a piled shoring wall and the lower basement levels. The works would dig up to about 13.79 m deep on a site of 17,960 m². The estimated development cost is $78,331,188, excluding GST.

The environmental impact statement (EIS) was exhibited from 17 Jun 2026 to 1 Jul 2026. The portal records 10 submissions: 3 objecting, 4 supporting and 3 commenting. The proponent responded and gave further information after two requests. The department recommended approval, and its Director approved the project on 6 Nov 2026 as the Minister's delegate, with conditions. Next, the proponent must meet those conditions, including management plans, before works start. The main works are assessed separately.

Estimated development cost
$78.3MSSD-SSI Assessment Report
Site area
17,960 m²SSD-SSI Assessment Report
Maximum excavation depth
13.79 mSSD-SSI Assessment Report

The department's description

Earlyworks for Eastlakes Shopping Centre redevelopment, including:

- Site Establishment

- Erosion and sediment control

- Bulk excavation

- Construction and anchoring of piled shoring wall and capping beam

- Infrastructure services coordination

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

10 submissions: 9 from the public and 1 from public authorities

Object3
Support4
Comment3

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

74 documents in 9 folders, each on the NSW Planning Portal

Notice of Exhibition1
Early Consultation1
Request for SEARs3
SEARs2
EIS21
Response to Submissions17
Agency Advice11
Additional Information11
Determination7

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.