State significant development

Dumaresq Solar Farm

A 190 MW solar farm with battery at Bonshaw Road, Bonshaw

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 190 MW solar farm with battery at Bonshaw Road, Bonshaw

The proponent proposes a solar farm with a battery energy storage system and supporting infrastructure, with a capacity of up to 190 MW, at 3500 Bonshaw Road, Bonshaw, between Ashford and Bonshaw in the Inverell Shire. The facility would be built on a parcel of about 205 ha that has been used for grazing and cropping. The battery would be at most 190 MW with 4 hours of storage, and its final size is still being assessed. No capital investment figure is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). Fresh Secretary's environmental assessment requirements (SEARs) have been issued, and agencies have given comments. The proponent's earlier requirements from 10 Mar 2020 were withdrawn. No public submissions have been made yet. Next, the EIS is to be lodged and exhibited, and the public can then make submissions before the department assesses the project.

Solar farm and battery capacity
190 MWScoping Report
Battery storage duration (maximum)
4 hoursScoping Report
Land parcel
205 haScoping Report

The department's description

Development of a 190 MW solar farm with energy storage and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Bonshaw
Council area
Inverell

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.