On the map
State significant development

Deepwater Solar Farm

A 120 MW solar farm and battery at Deepwater

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 120 MW solar farm and battery at Deepwater

The proponent proposes a solar farm with a capacity of up to 120 MW and a 120 MW, 4-hour battery energy storage system (BESS) of 480 MWh, at 5080 New England Highway, Deepwater, in Tenterfield Shire. The project site is about 1,086 ha, with a development footprint of about 316 ha. It would use 240,000 solar panels and connect to an existing 132kV overhead line. Three access points are proposed from the New England Highway. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) have been issued, and agencies have given advice on them. The scoping report is dated 14 Feb 2025. There are no public submissions yet. Next, the EIS is to be exhibited and the public can make submissions. The department then assesses the project.

Solar generating capacity
120 MWScoping Report
Battery power capacity
120 MWScoping Report
Battery storage capacity
480 MWhScoping Report
Project site area
1,086 haScoping Report
Development footprint
316 haScoping Report
Solar panels
240,000 panelsScoping Report

The department's description

Construction and operation of a 120 MW solar farm and a 120 MW Battery Energy Storage System (BESS).

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Deepwater
Council area
Tenterfield

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.