On the map
State significant development

Crudine Ridge Wind Farm

Decided: approved on 10 May 2016Other

Where it is in the process

Approved on 10 May 2016

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination10 May 2016 (done)
  9. Approved10 May 2016

What it proposes

The department's description

Construction and operation of a 37 turbine wind farm, with a capacity to generate up to 135 MW of electricity, plus ancillary infrastructure (including substation, grid connection, access tracks and road upgrades along the project transport route).

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

180 submissions: 168 from the public and 12 from organisations

Object135
Support17
Comment28

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

3 changes to the project after its decision, each assessed as a case of its own, newest first.

MOD 3 - Administrative Development Corridor AdjustmentSSD-6697-Mod-3

Decided: approved on 21 Sep 2020 by the department (director)

Boundary adjustment to include constructed meteorological mast

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 2 - Internal access tracksSSD-6697-Mod-2

Decided: approved on 22 May 2020 by the department (director)

Removing two sections of internal access track totalling 1590 metres in length, and replaced with two short sections of new track totalling 730 metres in length.

Its 8 documents

8 documents in 4 folders, each on the NSW Planning Portal

Modification Application4

See the 4 documents on the Planning Portal

Additional Information1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 1 - Revised Road DesignSSD-6697-Mod-1

Decided: approved on 21 Jun 2019 by the Independent Planning Commission · 246 submissions

The proposed modification involves a reduction in the number of turbines from 77 to 37 and a revised road design for Aarons Pass Road.

Its 15 documents

15 documents in 5 folders, each on the NSW Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Response to Submissions3

See the 3 documents on the Planning Portal

Additional Information4

See the 4 documents on the Planning Portal

Recommendation3

See the 3 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Pyramul
Council areas
Bathurst Regional, Mid-Western Regional

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.