Crows Nest OSD Site B
A 15 storey residential tower above Crows Nest Metro Station
Where it is in the process
Approved on 16 Apr 2026
What it proposes
AI summary. Written from this project's page and its Development Consent and Crows Nest OSD Site B - Department's Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 15 storey residential tower above Crows Nest Metro Station
The project is a 15 storey residential tower above the completed Crows Nest Metro Station at 25 Hume Street, Crows Nest, in the North Sydney Council area. It has 122 dwellings on 12 storeys, with three storeys of parking for 78 car spaces and 12,987 m² of residential floor area. At least 5% of that floor area is for affordable housing. The estimated development cost is $85,634,000 and the tower would have 70 operational jobs.
The environmental impact statement was exhibited from 15 Nov to 12 Dec 2024. The proponent then amended the project, replacing a residential floor with parking, and the amendment was exhibited in September 2025. The two rounds drew 8 submissions in total, and the council objected. The Independent Planning Commission approved it on 16 Apr 2026, with conditions. Next, the proponent must meet those conditions before and during construction.
- Estimated development cost
- $85.6MCrows Nest OSD Site B - Department's Assessment Report
- Dwellings
- 122 dwellingsDevelopment Consent
- Car parking spaces
- 78 car spacesDevelopment Consent
- Residential floor area
- 12,987 m²Development Consent
- Building height
- 15 storeysDevelopment Consent
- Site area
- 1,871 m²Crows Nest OSD Site B - Department's Assessment Report
The department's description
Proposed over station mixed use and residential development comprising of:
122 residential apartments
78 car parking spaces
Use of retail / commercial space with station box
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
10 submissions: 7 from the public, 1 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
126 documents in 10 folders, each on the NSW Planning Portal
Notice of Exhibition2
Request for SEARs1
EIS38
- 01 - SEARS
- 02 - Consolidated Concept Consent - SSD-9579
- 03 - Architectural Drawing Set
- 04 - Architectural Report
- 05 - Design Integrity Report and Design Statement
- 07 - Landscape Design Report
- 08 - BCA Report
- 09 - Access Report
- 10 - Survey Plan
- 11 - Wind Report
- 12 - Landscape and Visual Impact Assessment
- 13 - CPTED Report
- 14 - Arborist Report
- 16 - ESD Report
- 17 - Transport and Accessibility Impact Assessment
- 18 - Carparking Strategy and Management Plan
- 19 - Green Travel Plan
- 20 - Construction Traffic Management Plan
- 21 - Vehicle Servicing Management Plan
- 22 - Noise and Vibration Impact Assessment
- 23 - Geotechnical Contamination and Remediation Report
- 24 - Integrated Water Management Plan
- 25 - Flood Impact Assessment
- 26 - Aboriginal Heritage Report
- 27 - Statement of Heritage Impact
- 28 - Social Impact Assessment
- 29 - Utilities Services Infrastructure Assessment
- 30 - Aviation Report
- 31 - Public Art Strategy
- 32 - Construction and Demolition Waste Management Plan
- 33 - Operational Waste Management Plan
- 34 - BDAR Waiver
- 35 - Compliance with Concept Approval
- 36 - North Sydney Development Control Plan.
- 37 - Reflectivity Report
- 38 - Public Benefit Offer
- Application_20241025050508
- EIS - Site B Crows Nest
Response to Submissions20
- Appendix 1 - Solar Access
- Appendix 2 - Cross Ventilation Drawing
- Appendix 3 - Wind Engineering Correspondence
- Appendix 4 - Review of Wind Engineering Correspondence
- Appendix 5 - Communal Open Space Drawing
- Appendix D1 - Architectural Response
- Appendix D2 - Wind Response
- Appendix D3 - Cross Ventilation Advice
- Appendix D4 - Acoustic Response
- Appendix D5 - Legal Advice Response
- Appendix D6 - Waste Management Response
- Appendix D7 - Social Impact Response
- Appendix D8 - Landscape Response
- Appendix D9 - Structural Response
- Compliance Massing Study
- Site B - Crows Nest - RTS and Amending DA Correspondence
- Site B_Crows Nest_RTS Report#2
- Swept Path Analysis
- Updated Operational Waste Management Plan
- Willowtree Planning - OSD Site B - Add Info_v2
Agency Advice21
- AR - Ausgrid
- AR - DCCEEW Water
- AR - FRNSW
- AR - HeritageNSW
- AR - HeritageNSW ACH
- AR - North Sydney Council
- AR - SWC
- AR - Sydney Metro
- AR - TfNSW
- EIS - Air Services Australia
- EIS - Ausgrid
- EIS - CASA
- EIS - FRNSW
- EIS - HNSW ACH
- EIS - HeritageNSW
- EIS - NSW DCCEEW Water
- EIS - North Sydney Council
- EIS - Syd Airport
- EIS - Sydney Airport - Controlled Activity Referred
- EIS - Sydney Metro
- EIS - TfNSW
Amendments37
- Appendix 01 - Architectural Drawings
- Appendix 02 - Architectural Report
- Appendix 03 - Design Integrity Report and Design Statement
- Appendix 04 - BCA Report
- Appendix 05 - Access Report
- Appendix 06 - Reflection
- Appendix 07 - Wind Addendum
- Appendix 08 - Landscape and Visual Impact Assessment
- Appendix 09 - Landscape Design Report
- Appendix 10 - ESD
- Appendix 11 - Traffic Report - SSDA Addendum
- Appendix 12 - Noise and Vibration Report
- Appendix 13 - Stormwater Addendum
- Appendix 14 - Flood
- Appendix 15 - Operational Waste Management Plan
- Appendix 16 - Heritage - European and Aboriginal
- Appendix 17 - Utilities Service Service Infrastructure
- Appendix 18 - Avaition Report
- Appendix 19 - Structural Design Change
- Appendix 20 - Car Parking Strategy and Management Plan
- Appendix 21 - Transport and Accessibility Impact Assessment
- Appendix 22 - CPTED Addendum
- Appendix 23 - Contamination
- Appendix 24 - Social Impact Assessment
- Appendix 25 - RTS Report
- Appendix D1 - Structural Engineer Response to SDRP
- Appendix D10 - Landscape SDRP Response
- Appendix D11 - Building Ventilation Standards
- Appendix D2 - Architectural RTS Response
- Appendix D3 - Sustainability Response to SDRP
- Appendix D4 -Wintergarden Ventilation Assessment
- Appendix D5 - Wind SDRP Response
- Appendix D6 - Acoustic Response to SDRP
- Appendix D7 - Legal Advice RTS Response
- Appendix D8 - Traffic RTS Response
- Appendix D9 - SIA Response
- Crows Nest Site B - Amendment Report
Additional Information1
Recommendation2
What's near it
Where it is
- Suburb
- Crows Nest
- Council area
- North Sydney
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.