Crows Nest OSD Site A - Amending Concept SSDA
Three residential towers above Crows Nest Metro Station
Where it is in the process
Approved on 26 Mar 2026
What it proposes
AI summary. Written from this project's page and its Crows Nest - Amending Concept - Assessment Report and Crows Nest - Amending Concept - Instrument on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Three residential towers above Crows Nest Metro Station
This amending concept application changes the approved building envelopes on Site A at 32 Hume Street, Crows Nest, above the Crows Nest Metro Station, in the North Sydney Council area. It replaces one commercial tower with three residential towers, two of them to RL 188.3 m and one to RL 140.7 m. It adds 3,383 m² of floor area, taking Site A to 43,683 m². At least 15% of floor area must be affordable housing. The concept does not approve any building work. No capital investment is stated.
The environmental impact statement (EIS) was exhibited from 4 Jul 2025 to 4 Aug 2025. The amendment was exhibited from 2 Dec 2025 to 15 Dec 2025. There were 2 submissions, both objecting: 1 from the public and 1 from a public authority. The council also objected. The department recommended approval, and its Director approved it on 26 Mar 2026. Future development applications must still be lodged and assessed for each building.
- Additional floor area on Site A
- 3,383 m²Crows Nest - Amending Concept - Assessment Report
- Total Site A floor area
- 43,683 m²Crows Nest - Amending Concept - Assessment Report
- Tower 1 and 2 height limit
- 188.3 m RLCrows Nest - Amending Concept - Assessment Report
- Tower 3 height limit
- 140.7 m RLCrows Nest - Amending Concept - Assessment Report
- Site area
- 3,879 m²Crows Nest - Amending Concept - Assessment Report
- Minimum affordable housing share
- 15% of floor areaCrows Nest - Amending Concept - Instrument
The department's description
Crows Nest OSD Site A - Amending Concept SSDA
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
2 submissions: 1 from the public and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
155 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs11
- App B_Architectural Updated Concept Plans
- App B_SSD-9579 Determination_Stamped Plans
- App C_Survey Plan
- App D_Land Use Economic Appraisal
- App E_Demographic Study
- App F_Pedestrian Wind
- App G_Community Engagement_Essential Workers Flyer
- App G_Community Engagement_HP Flyer
- App H_BDAR Waiver Request
- Crows Nest OSD_Site A_Site Context
- Crows Nest_Site A_Amend Concept SSDA_Scoping Report
EIS73
- App 01 Executive Summary
- App 02 SEARs Compliance Table
- App 03 Statutory Compliance Table
- App 04 Mitigation Measures Table
- App 05 Cumulative Impact Assessment Table
- App 06 Amendments to Conditions of Consent
- App 07 CPTED
- App 08 Social Impact Statement
- App 09 Community & Stakeholder Engagement Strategy
- App 10 Community Engagement Outcomes Report
- App 11 Community Consultation and Engagement Plan
- App 12 Operational Plan of Management
- App 13 Estimated Development Cost Report
- App 14 Owners Consent
- App 15 Evolve Housing Letter of Support &Brochure
- App 16 Survey Plan & Subdivision Plan
- App 17 Architectural Plans - Concept Envelope
- App 17 Architectural Plans - Indicative Scheme
- App 18 Design Report (incl Public Domain Plan)
- App 19 Design Excellence Strategy - Site A & B
- App 20 Design Integrity Report
- App 21 SDRP Design Review Report
- App 22 Housing SEPP Design Statement
- App 23 Photomontage
- App 24 Public Art Strategy
- App 25 Connection to Country Report
- App 26 Aboriginal Design Principles Report
- App 27 Aboriginal Cultural Heritage & Arch
- App 28 Statement of Heritage Impact
- App 29 View Loss and View Sharing Assessment
- App 30 Visual Analysis - View Loss and Sharing
- App 31 Landscape and Visual Impact
- App 32 Visual Impact from Public Domain
- App 33 Shadow Diagrams
- App 34 Landscaping Plans
- App 34 Landscaping Report
- App 35 Arboricultural Impact Assessment
- App 36 BDAR Waiver
- App 37 Accessibility Assessment Report
- App 38 Exterior Lighting Light Spill Report
- App 39 Reflected Glare Report
- App 40 Pedestrian Wind Environment
- App 41 Flood Impact Risk Assessment
- App 42 Air Quality Management Plan
- App 43 Operational Waste Management Plan
- App 44 C&D Waste Management Plan
- App 45 Traffic, Transport & Accessibility
- App 46 CPTMP
- App 47 Vehicular Servicing Management Plan
- App 48 Car Parking Strategy & Management
- App 49 Green Travel Plan
- App 50 Geotechnical Statement
- App 51 Preliminary Site Investigation Statement
- App 52 Preliminary Hazard & Risk Screening
- App 53 Noise & Vibration Impact Assessment
- App 54 Structural Statement
- App 55 Stormwater Management Plan
- App 55 Stormwater Management Report
- App 56 Aviation Impact Assessment
- App 57 Construction Environmental Management
- App 58 Ecologically Sustainable Design Report
- App 59 BASIX Certificate
- App 60 NatHERS Certificate
- App 61 NABERS Embodied Emission Material
- App 61 NABERS Embodied Emission Material Form
- App 62 Net Zero Statement
- App 63 BCA Assessment Report
- App 64 Water Management & Utility Services
- App 65 Consultation with Fire and Rescue NSW
- App 66 Vertical Transportation Report
- App 67 Land Use & Economic Appraisal
- Application_20250618054327
- Crows Nest OSD_Site A Environmental Impact Statement
Response to Submissions5
Agency Advice14
- Amendment stage - Council response
- Amendment stage - Council response attachment
- Amendment stage - Sydney Metro response
- EIS stage - Ausgrid response
- EIS stage - CASA comments
- EIS stage - Council placeholder
- EIS stage - Council recommended conditions
- EIS stage - Council submission
- EIS stage - Sydney Metro response
- EIS stage - TfNSW response
- SEARs stage - HNSW ACH
- SEARs stage - HNSW EH
- SEARs stage - Sydney Metro
- SEARs stage - TfNSW
Amendments46
- Amendment Acceptance Letter_25112025_125536
- Amendment Report - Amending Concept SSD
- Appendix A Concept Response to Submissions Report
- Appendix AA Vertical Transportation Services Report
- Appendix B Amended Concept Mitigation Measures Table
- Appendix BB Amendment Memo Design Quality Guidelines
- Appendix C Concept Clause 4.6 Variation Request
- Appendix CC Draft Notice of Modifications
- Appendix D Architectural Plans Concept Envelope
- Appendix DD Amendments to Concept Conditions of Consent
- Appendix E Architectural Plans Indicative Scheme
- Appendix EE Stormwater Management Report
- Appendix EE Stormwater Plans
- Appendix F Concept Design Report
- Appendix FF Concept ESD Report
- Appendix G Housing SEPP Design Statement
- Appendix GG BASIX Certificate
- Appendix GG Stamped Architectural Plans
- Appendix H Concept Photomontages
- Appendix HH NatHERS Summary Certificate
- Appendix HH Thermal Specification
- Appendix I Landscape Plans
- Appendix I Landscape Report
- Appendix II Concept Structural Letter
- Appendix J Concept CPTED Report
- Appendix JJ TTA Impact Assessment
- Appendix K Concept Aviation Impact Assessment
- Appendix KK Vehicular Servicing Management Plan
- Appendix L Concept Plan of Management
- Appendix LL Green Travel Plan
- Appendix M Aboriginal Archaeological Assessment
- Appendix MM Construction Traffic Management Plan
- Appendix N Statement of Heritage Impact
- Appendix NN Car Parking Strategy and Management Plan
- Appendix O Concept Landscape and Visual Impact Assessment
- Appendix P View Loss and View Sharing
- Appendix Q View Loss and View Sharing Report
- Appendix R Shadow Diagrams
- Appendix S Visual Impact from the Public Domain
- Appendix T Noise and Vibration Impact Assessment
- Appendix U Pedestrian Wind Environment Study
- Appendix V Operational Waste Management Plan
- Appendix W Construction Waste Management Plan
- Appendix X Accessibility Assessment Report
- Appendix Y BCA Assessment Report
- Appendix Z WaterManagementPlan&UtilityServicesInfrasture
What's near it
Where it is
- Suburb
- Crows Nest
- Council area
- North Sydney
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.