On the map
Part 3A project

Cronulla Residential Flats (Coast Ave)

Decided: refused on 28 Sep 2006Homes

Where it is in the process

Refused on 28 Sep 2006

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination28 Sep 2006 (done)
  10. Refused28 Sep 2006

What it proposes

The portal gives no description.

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

1 document in 1 folder, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.