State significant infrastructure

Cowarra Water Supply Scheme

Cowarra water treatment plant and pipeline, Lake Innes

Decided: approved on 27 Jan 2026Water and sewerageNeighbourhood scale

Where it is in the process

Approved on 27 Jan 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination27 Jan 2026 (done)
  9. Approved27 Jan 2026

What it proposes

AI summary. Written from this project's page and its SSD-SSI Assessment Report and SSI Instrument of Approval on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Cowarra water treatment plant and pipeline, Lake Innes

Port Macquarie-Hastings Council proposed a water treatment plant and a clear water reservoir on Cowarra Access Road, Lake Innes, with a water trunk main about 20.5 km long running through Lake Innes, Thrumster, Sancrox and Port Macquarie. The plant is sized to treat up to 9,900 megalitres a year. The capital investment is $165,000,000, with up to 100 construction jobs and 3 operational jobs. Construction would take about 24 months.

The environmental impact statement (EIS) was exhibited from 3 Jul 2024. An amendment report was exhibited from 14 May 2025 to 27 May 2025. The department received 12 submissions: 8 objecting, 2 supporting and 2 commenting. The department's assessment found the impacts could be managed. A director of the department, as the Minister's delegate, approved the project on 23 Jan 2026, with conditions. Next, the proponent must meet those conditions before and during construction.

Capital investment
$165MSSD-SSI Assessment Report
Pipeline length
20.5 kmSSD-SSI Assessment Report
Water treatment capacity
9,900 megalitres a yearSSD-SSI Assessment Report
Construction jobs
100 jobsSSD-SSI Assessment Report
Operational jobs
3 jobsSSD-SSI Assessment Report
Native vegetation to be cleared
6.94 haSSD-SSI Assessment Report
Project footprint
59.4 haSSD-SSI Assessment Report

The department's description

Water treatment and supply system including Water Treatment Plant (WTP), Clear Water Reservoir, WTP Sludge Dewatering System, 15.5 km pipeline to connect to water reticulation systems, and ancillary works for access and energy supply

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

12 submissions: 11 from the public and 1 from organisations

Object8
Support2
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

81 documents in 13 folders, each on the NSW Planning Portal

Notice of Exhibition1
Application2
SEARs2
EIS19
Response to Submissions8
Agency Advice21
Amendments2
Additional Information2
Determination3
Management Plans and Strategies14
Independent Reviews and Audits1
Notifications2
Other Documents4