State significant development

Constellation Project

Constellation copper mine, near Girilambone

Decided: approved on 24 Dec 2025MiningDistrict scale

Where it is in the process

Approved on 24 Dec 2025

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination24 Dec 2025 (done)
  9. Approved24 Dec 2025

What it proposes

AI summary. Written from this project's page and its Assessment Report and Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Constellation copper mine, near Girilambone

The Constellation Project is an open cut and underground copper mine about 20 km north-east of Girilambone, in the Bogan Shire. It would mine an average of 500,000 tonnes of ore a year, up to 1 million tonnes in peak periods, and haul it to the existing Tritton Copper Mine for processing. Total disturbance is about 185 ha, with about 97 ha of native vegetation cleared. Mine life is up to 16 years. The workforce is about 95 full time equivalent staff in construction and 178 in operation. No capital investment is stated.

The environmental impact statement (EIS) was exhibited from 15 Aug 2024 to 11 Sep 2024 and drew 2 submissions: 1 objecting and 1 commenting. The proponent responded and amended the project. The department's Director approved it on 24 Dec 2025 as the Minister's delegate, with conditions. Next, the proponent must prepare the management plans the consent requires before work starts.

Average ore mined a year
500,000 tonnes a yearAssessment Report
Total surface disturbance
185 haAssessment Report
Native vegetation to be cleared
97 haAssessment Report
Maximum mine life
16 yearsAssessment Report
Construction workforce
95 FTE employeesAssessment Report
Average operational workforce
178 FTE employeesAssessment Report
Submissions
2 submissionsPortal page

The department's description

Development of an open cut and underground mining operation.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

2 submissions: 1 from the public and 1 from organisations

Object1
Support0
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

3 changes to the project after its decision, each assessed as a case of its own, newest first.

Modification 3 - Temporary Ore TransportationSSD-41579871-Mod-3

Under way: at prepare mod report

Temporary use of an alternative ore haulage route and increased haulage movements for transport of ore from the Constellation Copper Mine to the Tritton Copper Mine while the approved Mitchell Highway intersection is completed.

Its 1 documents

1 document in 1 folder, each on the NSW Planning Portal

Early Consultation1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 2 - Optimisation and ExpansionSSD-41579871-Mod-2

Under way: at prepare mod report

Modification to increase production, expand the open cut pit and waste rock emplacement, enable 24/7 haulage, and update associated mine infrastructure

Its page on the Planning Portal

MOD 1 - Minor Infrastructure RelocationSSD-41579871-Mod-1

Decided: approved on 18 Jun 2026 by the department (team leader)

Minor modification to infrastructure locations within the Mine Site to support efficient site establishment and construction activities

Its 4 documents

4 documents in 3 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

130 documents in 13 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs2
SEARs2
EIS39
Response to Submissions6
Agency Advice40
Amendments4
Additional Information13
Determination3
Management Plans and Strategies16
Independent Reviews and Audits2
Notifications1
Other Documents1

What's near it

Where it is

Suburb
Girilambone
Council area
Bogan

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.