On the map
State significant development

Concept Mixed-use Development with Infill Affordable Housing - Blocks A and B -37-39 Hill Rd, Wentworth Point

More homes and affordable housing at 37-39 Hill Road, Wentworth Point

Under way: at prepare eisHomesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Updated Scoping Report 18Mar26 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

More homes and affordable housing at 37-39 Hill Road, Wentworth Point

The proponent seeks to amend an existing concept approval for Blocks A and B at 37-39 Hill Road, Wentworth Point, in the City of Parramatta. It would add about 15,520 m² of residential floor space, a 30% increase, including 10,142 m² of affordable housing floor space. Building envelopes would rise by 1 to 13 storeys on Block A, which would gain a new tower, and by 1 to 8 storeys on Block B. Car parking in the existing basement would also increase. No capital investment or number of dwellings is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The proponent's updated scoping report is dated 18 Mar 2026, and the Secretary's environmental assessment requirements (SEARs) have been issued. No submissions have been received. Next, the proponent exhibits the EIS, the public can make submissions, and the proponent responds. The department then assesses the proposal and decides it.

Additional residential floor space
15,520 m²Updated Scoping Report 18Mar26
Affordable housing floor space
10,142 m²Updated Scoping Report 18Mar26
Increase in residential floor space
30 per centUpdated Scoping Report 18Mar26
Affordable housing share
15 per centUpdated Scoping Report 18Mar26
Block A added height
13 storeysUpdated Scoping Report 18Mar26
Block B added height
8 storeysUpdated Scoping Report 18Mar26

The department's description

Amending concept SSDA to the existing concept approval (DA/999/2017) to increase residential floor space within Blocks A and B inlcuding provision of infill affordable housing.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.