On the map
State significant development

Coffs Harbour, Affordable Housing

A 60-home affordable housing building on Harbour Drive, Coffs Harbour

Decided: approved on 16 Apr 2026HomesNeighbourhood scale

Where it is in the process

Approved on 16 Apr 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination16 Apr 2026 (done)
  9. Approved16 Apr 2026

What it proposes

AI summary. Written from this project's page and its Final_SSD-SSI Assessment Report and Signed_SSD Instrument of Consent Holder on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 60-home affordable housing building on Harbour Drive, Coffs Harbour

The project is a part 4, part 5 storey residential flat building with 60 apartments, all for social housing, at 211A-215 Harbour Drive, Coffs Harbour, about 400 m south-east of the town centre. It would be up to 16.7 m high, with 4,755.9 m² of gross floor area, one basement level and 31 car spaces. The estimated development cost is $46,911,372, and it is expected to generate 167 construction jobs.

The environmental impact statement (EIS) was exhibited from 2 Oct 2025 to 15 Oct 2025. The department's report counted 18 submissions: 1 in support, 14 objecting and 3 comments, and the portal lists 21. Issues included traffic, vehicle access, the bus stop and flood emergency response. The proponent responded on 4 Dec 2025, moving the bus stop. The Minister approved the project on 16 Apr 2026, with conditions. Next, the proponent must meet those conditions before building.

Estimated development cost
$46.9MFinal_SSD-SSI Assessment Report
Construction jobs
167 jobsFinal_SSD-SSI Assessment Report
Affordable housing apartments
60 dwellingsFinal_SSD-SSI Assessment Report
Maximum building height
16.7 mSigned_SSD Instrument of Consent Holder
Maximum gross floor area
4,756 m²Signed_SSD Instrument of Consent Holder
Car parking spaces
31 car spacesSigned_SSD Instrument of Consent Holder
Site area
3,804 m²Final_SSD-SSI Assessment Report

The department's description

Construction of a residential flat building comprising social dwellings.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

21 submissions: 18 from the public, 2 from organisations and 1 from public authorities

Object16
Support1
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

57 documents in 7 folders, each on the NSW Planning Portal

Notice of Exhibition1
SEARs2
EIS30
Response to Submissions1
Agency Advice7
Additional Information12
Determination4

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.