On the map
State significant development

Cobar Wind Farm

A 216 MW wind farm 20 km north of Cobar

Under way: at prepare eisEnergy: windDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 216 MW wind farm 20 km north of Cobar

The proponent proposes a wind farm of up to 216 MW on Maryvale Station, about 20 km north-west of Cobar in the Cobar Shire. It would have up to 30 turbines with blade tips up to 280 m high, spread over about 7,800 ha, and a 50 MW / 100 MWh battery next to the substation. About 76 km of access tracks are planned. About 10 workers would run it once built. No capital investment is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report is dated 23 Feb 2024, and the Secretary's environmental assessment requirements (SEARs) have been issued. No submissions have been received yet. Next, the EIS is exhibited for public comment, the proponent responds to submissions, and the department assesses the project before it is decided.

Wind farm capacity
216 MWPortal page
Wind turbines
30 turbinesPortal page
Maximum turbine height
280 mPortal page
Battery power capacity
50 MWPortal page
Battery storage capacity
100 MWhPortal page
Project area
7,800 haScoping Report
Access tracks length
76 kmScoping Report
Operational workers
10 jobsScoping Report

The department's description

Construction and operation of a 216MW wind farm, including 30 WTGs up to 280m in height and a 50MW/100MWh BESS.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Cobar
Council area
Cobar

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.